    <title>bransam.ro — Electrical connection guides</title>
    <link>https://bransam.ro/en/blog/</link>
    <description>Practical guides on electrical connections in Romania: ATR, DIU, costs and timelines, by the SUN WATT team (ANRE licence no. 19761).</description>
    <language>en</language>
    <item>
      <title>Additional Pole for an Electrical Connection: When You Need One, Who Decides and Who Pays (2026)</title>
      <link>https://bransam.ro/en/blog/additional-pole-electrical-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/additional-pole-electrical-connection/</guid>
      <description>When an electrical connection needs an additional pole, who decides through the ATR, who pays and what it costs in 2026 — plus the underground alternative.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How long is the ATR valid? Expiry, extension and what to do next</title>
      <link>https://bransam.ro/en/blog/atr-validity-extension/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/atr-validity-extension/</guid>
      <description>How long the Technical Connection Approval (ATR) stays valid, what happens when it expires and how to extend or renew it with Retele Electrice Romania.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Battery storage and your prosumer grid connection: what actually changes (2026)</title>
      <link>https://bransam.ro/en/blog/battery-storage-prosumer-grid-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/battery-storage-prosumer-grid-connection/</guid>
      <description>How a battery changes the prosumer equation in 2026: hybrid system paperwork, approved injection power, adding storage to a certified system. Call 0733 097 440.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>The bidirectional meter for prosumers: who installs it, what it costs and how to get yours</title>
      <link>https://bransam.ro/en/blog/bidirectional-meter-prosumer-romania/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/bidirectional-meter-prosumer-romania/</guid>
      <description>What a bidirectional meter is, who installs it (only the distribution operator — Rețele Electrice România S.A. in Bucharest, Ilfov and Giurgiu) and what it costs.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Casa Verde solar panels and grid connection: what to do after installation (2026 guide)</title>
      <link>https://bransam.ro/en/blog/casa-verde-solar-programme-grid-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/casa-verde-solar-programme-grid-connection/</guid>
      <description>Installed solar panels through Casa Verde? The system cannot inject or offset energy until you are connected as a prosumer. Steps for 2026: 0733 097 440.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How to Change the Name on an Electricity Contract in Romania (2026 Guide)</title>
      <link>https://bransam.ro/en/blog/change-name-electricity-contract-romania/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/change-name-electricity-contract-romania/</guid>
      <description>Bought, inherited or rented a property in Romania? Here is how to change the name on the electricity contract: documents, steps, supplier vs distributor.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Electricity on Land Without a Land Registry Record (Carte Funciara): What Is Actually Possible</title>
      <link>https://bransam.ro/en/blog/connection-land-without-land-registry/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/connection-land-without-land-registry/</guid>
      <description>Electricity on land without carte funciara? The deed is required in the dossier; legal routes: register first or a temporary site connection from 2,200 lei.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Electricity Connection Cost per Meter: How Pricing Really Works in 2026</title>
      <link>https://bransam.ro/en/blog/electricity-connection-cost-per-meter/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/electricity-connection-cost-per-meter/</guid>
      <description>Electricity connection cost per meter in 2026: why pricing works per job, not per meter — single-phase from 1,800 lei, underground from 3,500 lei.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Electricity for a garage, annex or shed: extend the house installation or get a separate connection?</title>
      <link>https://bransam.ro/en/blog/electricity-garage-annex/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/electricity-garage-annex/</guid>
      <description>Two ways to get power to a garage, annex or shed in 2026: a new circuit from the house panel or a separate connection with its own meter. Costs and steps.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How long does it take to become a prosumer? Realistic timelines for 2026</title>
      <link>https://bransam.ro/en/blog/how-long-prosumer-grid-connection-takes/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/how-long-prosumer-grid-connection-takes/</guid>
      <description>How long it takes to become a prosumer in 2026: realistic timelines for the dossier, ATR, connection certificate and bidirectional meter in Romania.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Prosumer connection certificate: documents, steps and common mistakes</title>
      <link>https://bransam.ro/en/blog/prosumer-connection-certificate-documents/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/prosumer-connection-certificate-documents/</guid>
      <description>What the prosumer connection certificate is, the documents you need and the steps in 2026: application, PV system file, DIU, updated ATR. Call 0733 097 440.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Prosumer energy compensation in Romania: how injected energy lowers your bill (2026)</title>
      <link>https://bransam.ro/en/blog/prosumer-energy-compensation-billing-romania/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/prosumer-energy-compensation-billing-romania/</guid>
      <description>How energy fed into the grid offsets your prosumer bill in Romania: compensation mechanisms, what the invoice shows and why winter changes the math.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Relocating the electricity meter: who approves it, when it is needed and how the works are done</title>
      <link>https://bransam.ro/en/blog/relocating-electricity-meter/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/relocating-electricity-meter/</guid>
      <description>Who approves relocating an electricity meter in Romania, when moving the connection cabinet is required and how the works are done. Practical 2026 guide.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Removing an Electrical Connection (Desfiintare Bransament): Who Does It, When and How</title>
      <link>https://bransam.ro/en/blog/removing-electrical-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/removing-electrical-connection/</guid>
      <description>Disconnection, contract termination or removal (desfiintare bransament)? Who dismantles an electrical connection in Romania, the steps and rebuild costs.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Solar inverter vs approved power: how to match your inverter to the ATR (2026 guide)</title>
      <link>https://bransam.ro/en/blog/solar-inverter-approved-power-atr/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/solar-inverter-approved-power-atr/</guid>
      <description>Why your solar inverter must match the power approved in your ATR, when export limiting is required and how to request a power increase. Call 0733 097 440.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Solar panels on an apartment block in Romania: what actually works in 2026</title>
      <link>https://bransam.ro/en/blog/solar-panels-apartment-block-romania/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/solar-panels-apartment-block-romania/</guid>
      <description>Can you install solar panels on an apartment block in Romania? Roof approvals, the owners' association as prosumer, balcony solar and grid connection steps.</description>
      <pubDate>Wed, 10 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Documents You Need for an Electrical Connection in Romania (From Abroad): The Complete Checklist</title>
      <link>https://bransam.ro/en/blog/documents-electrical-connection-from-abroad/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/documents-electrical-connection-from-abroad/</guid>
      <description>Living in Spain, Italy or the UK and need to connect your Romanian property to the grid? Here is every document you need and how to send it online. Call/WhatsApp 0733 097 440.</description>
      <pubDate>Tue, 09 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How to Get an Electrical Connection in Romania While Living Abroad: The Complete Remote Guide (No Travel)</title>
      <link>https://bransam.ro/en/blog/electrical-connection-romania-non-resident/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/electrical-connection-romania-non-resident/</guid>
      <description>Living in Spain, Italy or the UK? Get the electrical connection (bransament) for your Romanian land or house 100% remotely, no travel needed. Step-by-step guide. Call/WhatsApp 0733 097 440.</description>
      <pubDate>Tue, 09 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Power of Attorney for an Electrical Connection in Romania: The Complete Guide for Romanians Abroad</title>
      <link>https://bransam.ro/en/blog/power-of-attorney-electrical-connection-romania/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/power-of-attorney-electrical-connection-romania/</guid>
      <description>Living abroad? Learn what your power of attorney (procura) must include to connect electricity in Romania remotely, and how to get it at the consulate or apostilled. Call 0733 097 440.</description>
      <pubDate>Tue, 09 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Remote Electrical Connection in Romania: How Long It Takes and What It Costs for the Diaspora</title>
      <link>https://bransam.ro/en/blog/remote-electrical-connection-romania-time-cost/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/remote-electrical-connection-romania-time-cost/</guid>
      <description>Living in Spain, Italy or the UK? See the full timeline and indicative costs to get your Romanian property connected to the grid 100% remotely. WhatsApp 0733 097 440.</description>
      <pubDate>Tue, 09 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>ANRE-authorised electrician: what the certification grades mean and why they matter</title>
      <link>https://bransam.ro/en/blog/anre-authorised-electrician-certification-grades/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/anre-authorised-electrician-certification-grades/</guid>
      <description>What the ANRE-authorised electrician grades (I, II, III, IV) and types A and B mean, what each can carry out and why certification matters for your connection.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Electrical connection and rising mains in apartment blocks: what they involve and how much they cost</title>
      <link>https://bransam.ro/en/blog/apartment-block-electrical-connection-rising-mains/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/apartment-block-electrical-connection-rising-mains/</guid>
      <description>Electrical connection and rising mains in apartment blocks: what the rising main, consumption separation and floor cabinets involve. Indicative costs and steps. Call 0733 097 440.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Apartment electrical installation: rewiring, layout and cost in 2026</title>
      <link>https://bransam.ro/en/blog/apartment-electrical-installation/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/apartment-electrical-installation/</guid>
      <description>A complete guide to apartment electrical installation in 2026: when it needs rewiring, the circuit layout, materials, stages and indicative costs. Advice from SUN WATT.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Three-phase connection for a commercial space or warehouse</title>
      <link>https://bransam.ro/en/blog/commercial-space-warehouse-three-phase-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/commercial-space-warehouse-three-phase-connection/</guid>
      <description>Three-phase 400V connection for commercial spaces or warehouses: three-phase connection from 2,900 lei, dossier+design from 900 lei, ATR, transformer station. SUN WATT, ANRE-certified.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Connecting a New House to Electricity: A Complete Guide from Land to Meter</title>
      <link>https://bransam.ro/en/blog/connecting-new-house-to-electricity/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/connecting-new-house-to-electricity/</guid>
      <description>Complete guide to connecting a new house to electricity: steps, documents, ATR, DIU and works. Single-phase from 1,800 lei, three-phase from 2,900 lei. Call 0733 097 440.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Connecting Land Outside the Built-Up Area to Electricity: What You Need to Know</title>
      <link>https://bransam.ro/en/blog/connecting-rural-land-electricity/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/connecting-rural-land-electricity/</guid>
      <description>Connecting land outside the built-up area to electricity: specifics, grid extension and higher costs. Single-phase connection from 1,800 lei, three-phase from 2,900 lei. SUN WATT, ANRE-certified.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Electrical connection cabinet: what it is, where it is fitted and what it costs</title>
      <link>https://bransam.ro/en/blog/connection-cabinet-explained/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/connection-cabinet-explained/</guid>
      <description>What the electrical connection cabinet (firida) is, the E1 and E2 types, where it is fitted at the property boundary and what it costs. bransam.ro guide with indicative prices and steps.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Energising the connection: the final step of grid connection</title>
      <link>https://bransam.ro/en/blog/connection-energisation-final-step/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/connection-energisation-final-step/</guid>
      <description>Energising the electrical connection: what it involves, conditions, the role of the DIU and the meter. Table of steps and indicative costs from 1,200 lei. bransam.ro guide.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Consumer unit wiring diagram: how to read it, with examples for houses and flats</title>
      <link>https://bransam.ro/en/blog/consumer-unit-wiring-diagram-explained/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/consumer-unit-wiring-diagram-explained/</guid>
      <description>How to read a consumer unit wiring diagram: symbols, MCBs, RCDs. Concrete diagram examples for a house and a flat, explained step by step.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How Much It Costs to Run Power from the Pole to Your House in 2026</title>
      <link>https://bransam.ro/en/blog/cost-to-connect-electricity-from-pole-to-house/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/cost-to-connect-electricity-from-pole-to-house/</guid>
      <description>How much does it cost to run power from the pole to your house in 2026? Single-phase connection from 1,800 lei, three-phase from 2,900 lei, underground from 3,500 lei.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Documents needed for an electrical connection: full checklist + the grid connection dossier</title>
      <link>https://bransam.ro/en/blog/documents-needed-electrical-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/documents-needed-electrical-connection/</guid>
      <description>Complete list of documents needed for an electrical connection and the grid connection dossier steps at Retele Electrice Romania. Clear checklist + stage table.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Earthing electrode: permitted values and standard resistance by installation type</title>
      <link>https://bransam.ro/en/blog/earthing-electrode-permitted-values/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/earthing-electrode-permitted-values/</guid>
      <description>Earthing electrode: permitted earth-resistance values by installation type. Under 1, 4 or 10 ohms? Practical guide, table and PRAM measurements. bransam.ro</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Earthing electrode testing (PRAM): why, how often and how much it costs</title>
      <link>https://bransam.ro/en/blog/earthing-electrode-testing-pram/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/earthing-electrode-testing-pram/</guid>
      <description>PRAM measurements and earthing electrode testing: permitted values, test report, frequency and costs from 250 lei. A complete guide for homes and businesses.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How much does an electrical connection cost in 2026 (real prices + cost factors)</title>
      <link>https://bransam.ro/en/blog/electrical-connection-cost/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/electrical-connection-cost/</guid>
      <description>How much an electrical connection costs in 2026: single-phase from 1,800 lei, three-phase from 2,900 lei, underground from 3,500 lei. See cost factors and the ATR fee.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Electrical installation project: contents, who prepares it and what it costs</title>
      <link>https://bransam.ro/en/blog/electrical-installation-project/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/electrical-installation-project/</guid>
      <description>What an electrical installation project contains, who can prepare it (ANRE-certified company), the approval stages and indicative costs. A practical SUN WATT guide.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>The components of an electrical panel: breakers, RCDs, SPDs and their roles</title>
      <link>https://bransam.ro/en/blog/electrical-panel-components/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/electrical-panel-components/</guid>
      <description>A complete guide to the components of an electrical panel: miniature circuit breakers (MCBs), residual current devices (RCD/RCBO), SPDs, the meter, and neutral/earth bars. Roles, ratings and practical tips.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Electricity meter installation: when, how and what documents</title>
      <link>https://bransam.ro/en/blog/electricity-meter-installation/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/electricity-meter-installation/</guid>
      <description>How the electricity meter is installed: steps after the DIU, required documents, the role of Retele Electrice Romania and indicative costs. Single-phase connections from 1,800 lei.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Grid connection application: what it contains and how to complete it in 2026</title>
      <link>https://bransam.ro/en/blog/grid-connection-application-form/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/grid-connection-application-form/</guid>
      <description>Grid connection application in 2026: what it contains, which documents to attach, how to complete it step by step and what happens after submission. Full bransam.ro guide.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Grid connection fee for the electricity network: how much it costs and what it includes in 2026</title>
      <link>https://bransam.ro/en/blog/grid-connection-fee-cost/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/grid-connection-fee-cost/</guid>
      <description>The grid connection fee for the electricity network in 2026: what it includes, how it is calculated via the ATR, indicative costs and what you pay the operator vs. the installer. Details and quote.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Grid Connection to PPC / Distributie Energie Muntenia (formerly Enel): a step-by-step guide</title>
      <link>https://bransam.ro/en/blog/grid-connection-ppc-muntenia-formerly-enel/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/grid-connection-ppc-muntenia-formerly-enel/</guid>
      <description>Today's "Enel" connection via Retele Electrice Romania (PPC): dossier steps, ATR, timelines and indicative costs. Single-phase connection from 1,800 lei, three-phase from 2,900 lei.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>The home electrical panel: components, fuses and sizing</title>
      <link>https://bransam.ro/en/blog/home-electrical-panel-components-and-fuses/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/home-electrical-panel-components-and-fuses/</guid>
      <description>Complete guide to the home electrical panel: components, miniature circuit breakers, RCD, circuit sizing, a reference table and tips from ANRE-certified electricians.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>House electrical installation at the structural phase: stages, materials and cost</title>
      <link>https://bransam.ro/en/blog/house-electrical-installation-structural-phase/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/house-electrical-installation-structural-phase/</guid>
      <description>House electrical installation at the structural phase: stages, routing, materials and indicative costs. Practical guide from an ANRE-certified firm for Bucharest, Ilfov and Giurgiu.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How long does an electrical connection take, from file to power in the socket</title>
      <link>https://bransam.ro/en/blog/how-long-does-an-electrical-connection-take/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/how-long-does-an-electrical-connection-take/</guid>
      <description>How long does an electrical connection take, from the connection file to power in the socket? Stages, indicative durations and legal deadlines in Bucharest, Ilfov and Giurgiu.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How to install an earthing system step by step (electrodes, strip, measurement)</title>
      <link>https://bransam.ro/en/blog/how-to-install-earthing-system/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/how-to-install-earthing-system/</guid>
      <description>How to install an earthing system: electrodes, OL-Zn strip, welding, salt/bentonite and PRAM measurement. Step-by-step guide, target values and indicative costs from 900 lei.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Reading your electricity meter: how to read the index correctly and submit it</title>
      <link>https://bransam.ro/en/blog/how-to-read-electricity-meter/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/how-to-read-electricity-meter/</guid>
      <description>Practical guide to reading your electricity meter: how to read the index correctly on mechanical and digital meters, which figures to submit and how to avoid estimated bills.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>kW, kVA and amps: what connection power do you need</title>
      <link>https://bransam.ro/en/blog/kw-kva-amps-what-power-you-need/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/kw-kva-amps-what-power-you-need/</guid>
      <description>How many kW does a single-phase connection have (~11 kW) vs three-phase (400V)? See the kW-kVA-amps difference, how to estimate the power you need, plus a load table.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Overhead vs underground electrical connection: cost differences and when to use each</title>
      <link>https://bransam.ro/en/blog/overhead-vs-underground-electrical-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/overhead-vs-underground-electrical-connection/</guid>
      <description>Overhead connection from 1,800 lei, underground from 3,500 lei. We compare cost, duration, approvals and aesthetics to help you choose. Details and a quote.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Power upgrade request: what the template includes, required documents and where to submit it</title>
      <link>https://bransam.ro/en/blog/power-upgrade-request-template/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/power-upgrade-request-template/</guid>
      <description>What a power upgrade (spor de putere) request contains, the documents needed, where to submit it to Retele Electrice Romania and the steps to ATR. Practical guide plus costs from 350 lei.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Power upgrade and switching from single-phase to three-phase: when and how much it costs</title>
      <link>https://bransam.ro/en/blog/power-upgrade-single-to-three-phase/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/power-upgrade-single-to-three-phase/</guid>
      <description>When you need a power upgrade or to switch from single-phase to three-phase, the steps involved and the cost. Three-phase from 2,900 lei. Call 0733 097 440.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Prosumer grid connection application: steps, documents and what the template contains</title>
      <link>https://bransam.ro/en/blog/prosumer-grid-connection-application/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/prosumer-grid-connection-application/</guid>
      <description>Prosumer grid connection application step by step: what documents you need, what the template contains, how to obtain the ATR and the bidirectional meter. Practical SUN WATT, ANRE guide.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Single-phase or three-phase connection? Differences, costs and when to choose each</title>
      <link>https://bransam.ro/en/blog/single-phase-vs-three-phase-connection/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/single-phase-vs-three-phase-connection/</guid>
      <description>Single-phase (230V) or three-phase (400V) connection? Compare power, costs (from 1,800 vs 2,900 lei) and learn when to pick each. Guide by SUN WATT SRL, ANRE-certified.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>The smart electricity meter: what it is, its advantages and how it is installed</title>
      <link>https://bransam.ro/en/blog/smart-electricity-meter/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/smart-electricity-meter/</guid>
      <description>What a smart electricity meter is, the advantages it brings, how it is installed by the operator and what role it plays in connecting photovoltaic prosumers.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Connecting solar panels to the grid: complete prosumer guide 2026 (ATR, bidirectional meter, steps)</title>
      <link>https://bransam.ro/en/blog/solar-panel-grid-connection-prosumer-guide/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/solar-panel-grid-connection-prosumer-guide/</guid>
      <description>Complete guide to connecting solar panels to the grid in 2026: connection request, ATR, bidirectional meter, prosumer dossier and the essential steps. Call 0733 097 440.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Technical Connection Approval (ATR): what it is, how to get it, how long it takes</title>
      <link>https://bransam.ro/en/blog/technical-connection-approval-atr-guide/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/technical-connection-approval-atr-guide/</guid>
      <description>What the Technical Connection Approval (ATR) is, what it contains, how to obtain it from Retele Electrice Romania and how long it takes. A step-by-step guide with timelines and indicative costs.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Technical Connection Approval: what the ATR template contains and how to read each section</title>
      <link>https://bransam.ro/en/blog/technical-connection-approval-atr-template/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/technical-connection-approval-atr-template/</guid>
      <description>What the Technical Connection Approval (ATR) template contains and how to read each section: approved power, connection solution, tariff and validity. A clear guide.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Temporary construction site connection: cost, documents and timeline</title>
      <link>https://bransam.ro/en/blog/temporary-construction-site-connection-guide/</link>
      <guid isPermaLink="true">https://bransam.ro/en/blog/temporary-construction-site-connection-guide/</guid>
      <description>Temporary construction site connection: cost from 2,200 lei, required documents, timeline and the steps through Retele Electrice Romania. B2B guide for builders. Call 0733 097 440.</description>
      <pubDate>Sun, 07 Jun 2026 00:00:00 GMT</pubDate>
    </item>