Full transparency

Electrical connection prices 2026

Unlike many competitors who hide their prices, we show them transparently. Below is an indicative price list and an instant cost calculator. For an exact figure, request a free quote.

Indicative price list

ServiceIndicative priceDetails
Single-phase connection from 1.800 lei casă / apartament, putere uzuală până la ~11 kW
Three-phase connection from 2.900 lei consum mare, putere 15+ kW
Overhead connection from 1.800 lei racord pe stâlp existent, distanță mică
Underground connection from 3.500 lei include săpătură și tub de protecție
Temporary site connection from 2.200 lei organizare de șantier / construcție
Grid connection from 900 lei dosar complet cu proiect tehnic + coordonare operator (proces de racordare)
Technical Connection Approval (ATR) from 350 lei doar asistență pentru obținerea Avizului Tehnic de Racordare
DIU utilisation dossier from 1.200 lei documentație întocmită de electrician atestat ANRE; în toată țara (fără manoperă de execuție)
Power increase from 350 lei creștere putere aprobată
Single to three-phase from 2.500 lei include dosar + execuție
Earthing & grounding from 900 lei include buletin de verificare
PRAM measurements from 250 lei verificări prize de pământ, continuitate, izolație
Electrical risers custom quote ofertă personalizată în funcție de proiect
Electrical installations custom quote ofertă personalizată; tarif pe punct sau pe proiect
Prosumer / solar connection custom quote racordare sistem fotovoltaic la rețea (prosumator): dosar, ATR, contor bidirecțional
EV charger connection custom quote circuit dedicat + spor de putere sau branșament trifazat, după caz
Warehouse & commercial connection custom quote trifazat sau post de transformare, în funcție de putere
Electrical reconnection custom quote repunere sub tensiune sau refacere branșament, după caz
Electricity supply contract activation and reactivation custom quote partea administrativă e gratuită, la furnizor; plătești doar lucrările tehnice, dacă sunt necesare (DIU, reconectare, ATR)

Prices are indicative (labour + usual materials, excluding the Rețele Electrice România operator fees). The final price is set by the Technical Connection Approval (ATR).

Questions about prices and costs

How much does an electrical connection cost?

As a guide, a single-phase connection starts from around 1,800 lei and a three-phase one from around 2,900 lei (labour + standard materials, excluding the operator's fees). The final price depends on the connection type (overhead/underground), the power, the distance to the grid and the connection tariff set out in the Technical Connection Approval (ATR). Ask for a free quote for an exact figure.

How long does an electrical connection take, from paperwork to power at the socket?

It varies: obtaining the Technical Connection Approval (ATR) from the operator usually takes a few weeks, while the actual works can be done in a few days once approvals are in place. Overall, from submitting the file to energisation, the process typically takes between 4 and 12 weeks, depending on the operator and complexity.

What documents do I need for an electrical connection?

Typically: your ID, the property deed (land registry extract), the urban planning certificate (for constructions), the site and zoning plans, plus the connection request. Buildings may also require the building permit. We prepare and submit the entire file for you.

What is the difference between single-phase and three-phase?

A single-phase connection (230V) is enough for homes with typical consumption (up to roughly 11 kW approved). A three-phase connection (400V) is needed for high consumption or powerful equipment (heat pumps, machine tools, workshops, fast EV charging). We can advise which one suits you.

Want the exact price for your case?

Send us the details and get a personalised, free quote within 24h.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp