Three-Phase Electrical Connection (400V) in Bucharest, Ilfov and Giurgiu — from 2,900 lei

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

From 2.900 lei · exact quote within 24h

SUN WATT is an ANRE-attested firm providing three-phase electrical connections (400V) in Bucharest, Ilfov and Giurgiu, with prices starting from 2,900 lei. A three-phase connection is required whenever you have high consumption or powerful equipment — for example heat pumps, workshops, machine tools or car charging stations. We take care of everything, from preparing the documentation and obtaining the Technical Connection Approval (ATR) right through to energisation, usually within 4 to 12 weeks. The grid operator for the region is Retele Electrice Romania (Distributie Energie Electrica Romania).

When you need it

A three-phase connection is suitable for any situation that requires power above roughly 11 kW: heat pumps, industrial workshops, electric motors, rapid EV charging stations, farms, and commercial premises with several consumers running at the same time. If your equipment is rated for 400V or your overall load is too great for a single-phase supply, a three-phase connection is the right choice.

How it works — step by step

  1. Free assessment and connection request. We determine the power you need and the appropriate type of connection, then prepare the documentation for the grid operator, Retele Electrice Romania (Distributie Energie Electrica Romania).
  2. Obtaining the Technical Connection Approval (ATR). The ATR (Technical Connection Approval) sets out the technical conditions and the connection tariff for your three-phase connection. This stage usually takes several weeks.
  3. Connection contract and design. Once the connection tariff has been paid, we design the three-phase installation — including the cable, the distribution board and the protections — in accordance with the standards in force.
  4. Execution of the three-phase connection. We install the overhead or underground connection, the distribution board and the protections, all correctly sized for your load.
  5. DIU file, meter and energisation. We prepare the DIU (Utilisation Installation Dossier), which allows the meter to be fitted and the power to be switched on.

Required documents

  • Identity document
  • Property deed (an up-to-date land registry extract)
  • Urban planning certificate
  • Location and site (cadastral) plans
  • Building permit (where applicable)
  • Connection request (prepared by SUN WATT)

Why bransam.ro

  • ANRE-attested for both execution and design
  • Full handling of all the bureaucracy on your behalf
  • Correct sizing of the power supply and the three-phase protections
  • We manage the relationship with the grid operator directly
  • Transparent quotes within 24 hours
  • DIU (Utilisation Installation Dossier) filing available nationwide

How long it takes

Typically between 4 and 12 weeks, depending on the grid operator and the complexity of the works.

Indicative price

ServiceIndicative priceDetails
Three-phase connection from 2.900 lei consum mare, putere 15+ kW

Prices are indicative (labour + usual materials, excluding the Rețele Electrice România operator fees). The final price is set by the Technical Connection Approval (ATR).

FAQ — Three-phase connection

How much does a three-phase electrical connection cost?

Prices start from around 2,900 lei, depending on the power required, the type of connection, the distance involved and the connection tariff set in the ATR (Technical Connection Approval).

What is the difference between a single-phase and a three-phase connection?

A single-phase connection (230V) is suitable for standard household consumption (up to around 11 kW), while a three-phase connection (400V) handles high power loads and industrial equipment.

How long does the work take?

Usually between 4 and 12 weeks, from filing the paperwork through to energisation.

What documents do I need?

An identity document, the property deed, the urban planning certificate, the location plans and the connection request.

Can I upgrade from a single-phase to a three-phase connection?

Yes. Switching from single-phase to three-phase requires submitting a request for a power increase (spor de putere).

Who is the local grid operator?

The region is served by Retele Electrice Romania (Distributie Energie Electrica Romania), formerly E-Distributie/Enel.

Need an electrical connection?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp