ANRE-certified · execution + design

Electrical connection & grid services

We are an ANRE-certified company for execution and design. We handle everything turnkey — from paperwork and approvals to the works and energisation — in Bucharest, Ilfov and Giurgiu. DIU files nationwide.

ANRE licence no. 19761 · execution + design
BU · IF · GR + DIU nationwide
24h fast quote
Free consultation & assessment

Electrical connections

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Overhead connection

From 1,800 lei. Exact quote within 24 hours.

from 1.800 lei Details →

Underground connection

An underground electrical connection brings power from the grid to your property through a cable buried in the ground, with no poles and no visible overhead cables. For a single-phase connection (230V), labour and material charges start from 3,500 lei, excluding the distribution operator's fees. The usual time from submitting the file to energisation is around 4-12 weeks, and the final connection price is set out in the Technical Connection Approval (ATR), the official document issued by the distribution operator that establishes the technical conditions and connection tariff.

from 3.500 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Rural / out-of-town land electrical connection

If the grid is close to your plot, an overhead connection starts from 1,800 lei (labour plus materials, excluding operator fees). If the network is far away, a grid extension is needed and its tariff is set by the operator through the ATR. Exact quote within 24 hours.

from 1.800 lei Details →

Connection cabinet (BMPM/BMPT) installation & replacement

The connection cabinet, called "firida de bransament" in Romanian, is the metering and protection block at the boundary of your property: the BMPM for single-phase (230V) supplies and the BMPT for three-phase (400V) supplies. It houses the meter and the main protection, and it is sealed by the distribution operator, so it can only be installed or replaced by a certified firm working in coordination with Retele Electrice Romania S.A. SUN WATT, an ANRE-certified company, installs and replaces BMPM/BMPT cabinets across Bucharest, Ilfov and Giurgiu on the basis of a personalised quote, handling all seal and meter formalities with the operator. Call 0733 097 440 for a free assessment.

quote Details →

Grid connection & dossiers (ATR, DIU, power increase)

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Single to three-phase

Switching from a single-phase connection (230V) to three-phase (400V) involves submitting a power-increase/modification request to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), obtaining a new ATR (Technical Connection Approval), and having the works carried out by an ANRE-certified firm. At SUN WATT, prices start from 2,500 lei (labour + materials, excluding operator fees), while the final connection cost is set in the ATR. As a rough guide, the process from filing to energisation takes around 4 to 12 weeks.

from 2.500 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Technical Connection Approval (ATR)

From 350 lei · exact quote within 24h.

from 350 lei Details →

DIU utilisation dossier

The Utilisation Installation Dossier (DIU) is the documentation of your indoor electrical installation, prepared by an ANRE-certified electrician. It is mandatory before the meter can be fitted and the supply energised. SUN WATT prepares DIU dossiers across the whole country, with indicative prices from 1,200 lei.

from 1.200 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

New-house electricity connection

Single-phase from 1,800 lei, three-phase from 2,900 lei (labour plus usual materials, excluding the operator's fees). We run the entire process for a new house — town planning certificate guidance, connection dossier, ATR, execution, DIU and meter — with an indicative overall timeframe of around 4 to 12 weeks.

from 1.800 lei Details →

Electrical installations

Electrical installations

SUN WATT carries out complete electrical installations for homes, blocks of flats, commercial spaces and warehouses as a company certified by ANRE (the Romanian energy regulator) for both design and execution. We work on the basis of a personalised quote, from the electrical plan through to a functional, authorised panel. We cover Bucharest, Ilfov and Giurgiu, with on-site evaluation visits. The final price depends on the number of circuits, the area and the materials used, and the quote is free and with no obligation. Call 0733 097 440.

quote Details →

Earthing & grounding

An earthing (grounding) system channels dangerous currents safely into the ground and protects people from electric shock. Our service starts from 900 lei and includes PRAM resistance measurements with an official verification report.

from 900 lei Details →

Electrical risers

The electrical riser is the main cable carrying power from the block's main distribution board up to the meters and apartment boards on each landing. SUN WATT SRL, a company certified by ANRE (the Romanian Energy Regulatory Authority) for both execution and design, replaces and refurbishes vertical (rising) and landing electrical risers in apartment blocks and stairwells, including the design, the works and the accompanying documentation. Each job is quoted individually, based on the number of apartments, the length of the riser and the condition of the existing installation; the quote is free of charge.

quote Details →

Need an electrical connection?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp