Electrical Reconnection After Disconnection

Electrical reconnection means restoring supply after a disconnection — for non-payment, on request, or because the connection was suspended or removed. If the physical connection still exists, reconnection is a matter of settling things with the supplier and the operator Retele Electrice Romania; if it was removed, a new connection file and works are needed. SUN WATT, an ANRE-certified company, checks the installation, prepares the necessary documentation (including the DIU where required) and manages the relationship with the operator. In 2026, the price is set by quote, after assessing the situation. Phone: 0733 097 440.

A connection can be disconnected for several reasons: unpaid bills, suspension on request (an unoccupied property), works, or because the old connection was removed. Restoring supply — reconnection — depends on how deep the disconnection was. If it was just a temporary suspension and the connection and meter physically exist, reconnection is resolved by settling the debt and a request to the supplier and operator. If the connection was removed (cabinet dismantled, riser taken out) or the installation is no longer compliant, reconnection effectively becomes a new connection process, with a file, possibly an ATR, and works.

SUN WATT SRL is an ANRE-certified company for design and execution and helps you restore supply correctly and legally: we check the state of the connection and the utilisation installation, determine what is needed (formalities only, or works too), prepare the documentation — including the DIU (Utilisation Installation Dossier) where the operator requires it at reconnection — and manage the relationship with Retele Electrice Romania. We cover Bucharest, Ilfov and Giurgiu.

When you need it

You need reconnection when the property was disconnected for non-payment and you want to restore supply after settling the debt, when you reopen a house or space suspended long ago, when you have bought a property with the connection disconnected, or when the old connection was removed and must be rebuilt. This also applies when, at reconnection, the operator asks for an updated Utilisation Installation Dossier or a check of the interior installation, because no valid documentation exists.

How it works — step by step

  1. Assessing the Situation and the Connection. We check why the property was disconnected and the state of the connection, the cabinet and the utilisation installation. We determine whether reconnection requires only formalities with the supplier and operator, or works too (cabinet, riser, DIU).
  2. Settlement and Reconnection Request. We guide you on settling with the supplier (where the disconnection was for non-payment) and prepare the reconnection / re-energisation request to Retele Electrice Romania, with the necessary documents.
  3. Works and Documentation (if needed). If the connection was removed or the installation is no longer compliant, we carry out the necessary works as an ANRE-certified company and prepare the DIU (Utilisation Installation Dossier) required for the meter to be fitted.
  4. Re-energisation. Once the formalities and any works are resolved, the operator refits or re-energises the meter and restores supply. You have power again, under legal and safe conditions.

Required documents

  • ID of the holder / new owner
  • Property deed (land registry extract), if the holder has changed
  • Proof of debt settlement (for disconnection due to non-payment)
  • Details of the old supply point (POD code, meter serial, if available)
  • Reconnection / re-energisation request (prepared by us)

Why bransam.ro

  • ANRE-certified — correct and legal reconnection, with a checked installation
  • We establish exactly what is needed: formalities only, or connection works too
  • We prepare the DIU (Utilisation Installation Dossier) when the operator requires it at reconnection
  • We manage the relationship with the supplier and with Retele Electrice Romania
  • Useful also when buying a property with the connection disconnected
  • Coverage across Bucharest, Ilfov and Giurgiu, with a quote after assessment

How long it takes

If the connection physically exists and it is only a matter of settlement and re-energisation, reconnection can be resolved in a few days, depending on the supplier's and operator's timelines. If the connection must be rebuilt or a new file is needed, the timeline approaches that of a connection (approximately 4–12 weeks). We give you an estimate after the assessment.

Indicative price

ServiceIndicative priceDetails
Electrical reconnection custom quote repunere sub tensiune sau refacere branșament, după caz

Prices are indicative (labour + usual materials, excluding the Rețele Electrice România operator fees). The final price is set by the Technical Connection Approval (ATR).

FAQ — Electrical reconnection

How do I reconnect the power after disconnection for non-payment?

First you settle the debt and any reconnection fees with the supplier. Then the re-energisation request is sent to the operator Retele Electrice Romania. If the connection and meter exist, reconnection is quick; if they were removed, works are needed. We guide you throughout.

How much does reconnecting a connection cost?

It depends on the situation. If it is only re-energisation, the cost is mainly the supplier's and operator's fees. If the connection was removed or the installation must be brought up to date, labour and materials are added, plus the DIU where required. We provide a clear quote after the assessment.

I bought a house with the power disconnected. What do I do?

We check the state of the connection and installation, help you transfer the supply point into your name (change of holder) and submit the reconnection request. If the installation is no longer compliant or the DIU is missing, we prepare the documentation and carry out the necessary works, as an ANRE-certified company.

My connection was removed. Can it still be reconnected?

Yes, but in practice it means a new connection: a connection file, possibly a new ATR (Technical Connection Approval) and the execution of the connection. We handle the whole process, from the file to energisation.

Who actually re-energises the meter?

The distribution operator Retele Electrice Romania refits or re-energises the meter and restores supply, once the formalities (settlement, request, DIU where applicable) are resolved. We prepare the documentation and works needed for the operator to reconnect.

How do I activate my supply contract if I was never disconnected?

If your connection is active and was never disconnected, you don't need reconnection, you need to activate your electricity supply contract, a free administrative procedure handled directly with the supplier. See our electricity supply contract activation and reactivation service for the required documents and for the cases where technical works are also needed.

Related services

Need an electrical connection?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp