A connection can be disconnected for several reasons: unpaid bills, suspension on request (an unoccupied property), works, or because the old connection was removed. Restoring supply — reconnection — depends on how deep the disconnection was. If it was just a temporary suspension and the connection and meter physically exist, reconnection is resolved by settling the debt and a request to the supplier and operator. If the connection was removed (cabinet dismantled, riser taken out) or the installation is no longer compliant, reconnection effectively becomes a new connection process, with a file, possibly an ATR, and works.
SUN WATT SRL is an ANRE-certified company for design and execution and helps you restore supply correctly and legally: we check the state of the connection and the utilisation installation, determine what is needed (formalities only, or works too), prepare the documentation — including the DIU (Utilisation Installation Dossier) where the operator requires it at reconnection — and manage the relationship with Retele Electrice Romania. We cover Bucharest, Ilfov and Giurgiu.
When you need it
You need reconnection when the property was disconnected for non-payment and you want to restore supply after settling the debt, when you reopen a house or space suspended long ago, when you have bought a property with the connection disconnected, or when the old connection was removed and must be rebuilt. This also applies when, at reconnection, the operator asks for an updated Utilisation Installation Dossier or a check of the interior installation, because no valid documentation exists.
How it works — step by step
- Assessing the Situation and the Connection. We check why the property was disconnected and the state of the connection, the cabinet and the utilisation installation. We determine whether reconnection requires only formalities with the supplier and operator, or works too (cabinet, riser, DIU).
- Settlement and Reconnection Request. We guide you on settling with the supplier (where the disconnection was for non-payment) and prepare the reconnection / re-energisation request to Retele Electrice Romania, with the necessary documents.
- Works and Documentation (if needed). If the connection was removed or the installation is no longer compliant, we carry out the necessary works as an ANRE-certified company and prepare the DIU (Utilisation Installation Dossier) required for the meter to be fitted.
- Re-energisation. Once the formalities and any works are resolved, the operator refits or re-energises the meter and restores supply. You have power again, under legal and safe conditions.
Required documents
- ID of the holder / new owner
- Property deed (land registry extract), if the holder has changed
- Proof of debt settlement (for disconnection due to non-payment)
- Details of the old supply point (POD code, meter serial, if available)
- Reconnection / re-energisation request (prepared by us)
Why bransam.ro
- ANRE-certified — correct and legal reconnection, with a checked installation
- We establish exactly what is needed: formalities only, or connection works too
- We prepare the DIU (Utilisation Installation Dossier) when the operator requires it at reconnection
- We manage the relationship with the supplier and with Retele Electrice Romania
- Useful also when buying a property with the connection disconnected
- Coverage across Bucharest, Ilfov and Giurgiu, with a quote after assessment
How long it takes
If the connection physically exists and it is only a matter of settlement and re-energisation, reconnection can be resolved in a few days, depending on the supplier's and operator's timelines. If the connection must be rebuilt or a new file is needed, the timeline approaches that of a connection (approximately 4–12 weeks). We give you an estimate after the assessment.
Indicative price
| Service | Indicative price | Details |
|---|---|---|
| Electrical reconnection | custom quote | repunere sub tensiune sau refacere branșament, după caz |
Prices are indicative (labour + usual materials, excluding the Rețele Electrice România operator fees). The final price is set by the Technical Connection Approval (ATR).