Relocating the electricity meter: who approves it, when it is needed and how the works are done

In short: The electricity meter belongs to the distribution operator, Retele Electrice Romania S.A. (formerly E-Distributie/Enel), so you can never move it yourself — the seals must not be touched. Relocation is approved by the operator following a written request, and it is usually needed when you renovate, build a new fence, or the operator requires the meter at the property boundary for access. An ANRE-certified company like SUN WATT SRL prepares the documentation and carries out the cabinet (firida) and supply column works, then the operator moves and re-seals the meter. Costs depend on the site: you get a personalised quote plus the operator's own fees.

It usually starts with something mundane: the builder needs to demolish the wall the meter hangs on, the new fence line no longer matches the old one, or a letter from the operator says the metering point must be accessible from the street. Suddenly you are searching for “who can move my electricity meter” — and finding a lot of contradictory answers.

Here is the short version, then the detail: the meter is not yours, the relocation is approved by the distribution operator, and the works around it (cabinet, column, documentation) are done by an ANRE-certified company. We handle that part daily, so this guide reflects how it actually works in 2026, not how forums say it worked ten years ago.

Why meter relocations come up

In Bucharest, Ilfov and Giurgiu, the requests we see fall into a few recurring situations:

  • Renovation or extension. You are insulating the facade, demolishing or rebuilding the wall the meter sits on, or enclosing a porch that currently contains the metering point. The meter has to come off that surface before the works can continue.
  • A new fence or a changed boundary. The cabinet was mounted on the old fence; the new fence sits on a slightly different line, is built from a different material, or the gate has moved. The cabinet has to be repositioned to match.
  • Operator access. Older properties often have the meter on the facade, inside the yard or even inside the house. The operator’s standard today is metering at the property boundary, readable from the public domain. When access becomes a problem, relocation to the boundary gets requested — sometimes by the operator itself.
  • Modernisation. A degraded wooden board, a rusted box, burnt terminals or an undersized installation. These cases are rarely “just a move”: they are usually combined with a new connection cabinet (firida de bransament) and updated protections, and often with a power increase.
  • New structures near the metering point. A garage, carport or terrace planned exactly where the cabinet stands.

If you recognise your situation in this list, the process below applies to all of them, with differences only in paperwork depth.

The first rule: the meter is not yours

The electricity meter, its seals and the metering equipment belong to the distribution operator — in our area, Retele Electrice Romania S.A. (the current name of the former E-Distributie / Enel). This is the single most important fact in the whole topic, because it explains everything else:

  • You cannot unscrew, move or “temporarily relocate” the meter yourself, not even by half a metre, not even for a day.
  • Breaking or disturbing a seal is treated as suspected tampering. Under the ANRE regulations in force, that can mean penalties and recalculated consumption — an expensive way to save a phone call.
  • Any electrician who offers to move the meter “quietly, without papers” is offering to create a problem on your property, not solve one.

There is, however, a clear split of responsibility. The metering point and everything on the grid side of it belong to the operator. The supply column — the circuit running from the cabinet to your distribution board — and everything after it are your installation. That split defines who does what during a relocation: the operator handles the meter itself; a certified company rebuilds what surrounds it.

Who approves the relocation, and what the approval looks like

The relocation is approved by the operator, full stop. The route is a written request to Retele Electrice Romania S.A. describing what you want moved, where and why, supported by photos and, where needed, technical documentation.

Depending on what actually changes, the answer takes one of two shapes:

  1. A simple works approval, when the metering point moves a short distance without changing the connection solution — for example, shifting the cabinet along the same fence.
  2. An updated connection solution through an ATR, when the relocation effectively modifies the connection: a new cabinet position at the boundary, a changed route, switching from a facade-mounted meter to a boundary cabinet, or relocation combined with a power increase. In these cases the file follows the normal connection-modification flow, and the Technical Connection Approval (ATR) is the document that fixes the new solution.

Which shape applies is the operator’s call, not ours and not yours. What we can do is frame the request correctly from the start, so it does not bounce back for missing information — bounced files are where most lost weeks come from.

What an ANRE-certified company does (and what we cannot do)

SUN WATT SRL (ANRE licence no. 19761) covers everything around the meter:

  • Site assessment. We look at the current metering point, the proposed position, the column route and the state of the existing equipment, and we tell you honestly whether your case is a simple move or a connection modification.
  • Documentation. The request, the technical documentation and the follow-up with the operator. Our connection dossier with design starts from 900 lei, and ATR assistance from 350 lei.
  • The physical works. Supplying and fitting the new cabinet, building or extending the supply column to your distribution board, masonry and sealing works, and verifying the earthing. A longer distance between the new cabinet and your board is not just “more cable” — the column cross-section must be recalculated for it.
  • Coordination at the metering step. We schedule the operator’s intervention, so the de-energisation, the meter move and the re-sealing happen in the right order and the property is without power for hours, not days.
  • Updated paperwork. When the user installation changes, the DIU (the user installation file) must reflect the new configuration — we prepare or update it from 1,200 lei.

What we cannot do, and will not do: touch the seals or move the meter itself. That step belongs to the operator’s team, and any company that claims otherwise should worry you.

The process, step by step

  1. Assessment and quote. Photos, measurements, a clear answer on whether you need a simple approval or an ATR.
  2. Request and documentation filed with the operator.
  3. Operator approval — the technical solution and conditions for the new position.
  4. Execution. New cabinet, column works, earthing, everything ready for the metering equipment.
  5. The operator relocates and re-seals the meter, then the installation is re-energised.
  6. Updated documents (DIU where applicable), so the paper trail matches reality.

From request to re-sealed meter, plan in weeks, not days. The works themselves typically take one to two days; the calendar is driven by the approval stage.

What it costs: a personalised quote plus the operator’s fees

We deliberately do not publish a “meter relocation price”, because there is no honest fixed number. Two relocations that sound identical on the phone can differ by a factor of three once you account for cabinet type, column length, overhead versus underground routing, masonry and finishes.

Your final cost has two components:

  • Our works — quoted after the site assessment, in writing, with scope clearly defined. The documentation services have stable starting prices (dossier with design from 900 lei, ATR assistance from 350 lei, DIU from 1,200 lei); the physical works are priced per project.
  • The operator’s fees — invoiced separately by Retele Electrice Romania S.A. for its own interventions and, where an ATR is involved, established through the operator’s paperwork. Nobody outside the operator can quote these figures reliably, and you should be sceptical of anyone who does.

Mistakes that cost time and money

  • Moving first, asking later. Building the new fence or insulating the facade before clarifying the metering point usually means redoing work. Plan the relocation as the first step, not the last.
  • Touching the seals. Worth repeating: the cheapest relocation is the one that does not start with a tampering investigation.
  • Ignoring the column. A cabinet moved 15 metres further from the house needs a recalculated, often thicker column. Skipping this check fails the operator’s verification.
  • Expecting next-day service. The operator’s approval has its own timeline. Start early, especially if the relocation gates a renovation schedule.

Planning works that touch the meter? Talk to us first

A ten-minute call before you sign the fence contract or start the facade can save you weeks. Send us photos of the current metering point and a sketch of what you are planning, and we will tell you what approval your case needs and what the realistic timeline looks like.

Call 0733 097 440 (WhatsApp works too) or write to us via the contact page. SUN WATT SRL — ANRE-certified design and execution, serving Bucharest, Ilfov and Giurgiu, with documentation services nationwide.

Frequently asked questions

Can I move the electricity meter or the connection cabinet myself?

No. The meter and its seals are the property of the distribution operator, Retele Electrice Romania S.A. Touching the seals or moving the metering equipment without approval is treated as suspected tampering and can lead to penalties and recalculated consumption, in line with the ANRE regulations in force. Even relocating the cabinet by half a metre needs the operator's approval. The correct route is a written request to the operator, works carried out by an ANRE-certified company, and the operator itself unsealing, moving and re-sealing the meter.

When is the meter required at the property boundary?

For new connections in the area served by Retele Electrice Romania S.A., the metering and protection block (BMPM for single-phase, BMPT for three-phase supplies) is placed in a cabinet at the property boundary, accessible from the public domain, so the operator can read and service the meter without entering the property. For older homes with the meter on the facade or indoors, relocation to the boundary is typically requested when the connection is modernised, when the approved power is increased, or when the operator cannot get reliable access. Each case is confirmed through the operator's approval or an updated ATR.

How long does a meter relocation take?

The physical works usually take one to two days: fitting the new cabinet, running or extending the supply column and preparing the connections. The overall timeline is longer, because it includes the operator's approval stage. In practice, plan for several weeks from the written request to the day the meter is re-sealed in its new position, depending on the complexity of the solution and the operator's schedule. Starting the paperwork before you build the new fence or begin facade works saves the most time.

How much does it cost to relocate the meter?

There is no fixed catalogue price, because the cost depends on the new position, the cabinet type, the length and routing of the supply column and any masonry works. You will have two cost components: our works, quoted after a site assessment, and the operator's own fees, invoiced separately by Retele Electrice Romania S.A. For the paperwork, our connection dossier with design starts from 900 lei, ATR assistance from 350 lei and the DIU file from 1,200 lei when the user installation changes. Call 0733 097 440 for a personalised quote.

Do I need a new DIU after the meter is moved?

Often, yes. If the relocation changes your user installation — a new supply column, a different route to the distribution board, a new cabinet position — the documentation describing that installation must reflect reality. The DIU (Dosarul Instalatiei de Utilizare, the user installation file) is the document the operator relies on at energisation, so an outdated one can block the final step. We prepare or update the DIU from 1,200 lei as part of the relocation works, so the operator can re-seal and energise without objections.

Need an electrical connection?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp