Grid connection fee for the electricity network: how much it costs and what it includes in 2026

In short: The grid connection fee for the electricity network is the amount you pay the distribution operator (Retele Electrice Romania S.A.) to connect your consumption point to the grid, and its final value is set through the Technical Connection Approval (ATR). Besides this official fee, there are costs for documentation and the execution of the electrical connection (bransament): at SUN WATT, a single-phase connection starts from 1,800 lei, a three-phase one from 2,900 lei, and the dossier with the connection project from 900 lei. The exact connection fee owed to the operator appears in the ATR, depending on power, distance and the technical solution.

Many property owners confuse the “grid connection fee” with the price of the electrical connection (bransament), but they are two different things. The grid connection fee is the regulated amount you pay the distribution operator for the actual connection to the grid, whereas the electrical connection itself (design, materials, execution) is the work carried out by an ANRE-certified company. In this article we explain clearly what the grid connection fee consists of in 2026, how it is calculated and what additional costs you need to factor in.

What the grid connection fee actually is

The grid connection fee is the value of the works through which the distribution operator extends and makes available the grid capacity needed for your new consumption point. In the Bucharest, Ilfov and Giurgiu area, the operator is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel, part of the PPC group).

This fee is not a fixed, “catalogue” amount. It is set individually, based on a technical assessment, and is officially recorded in the Technical Connection Approval (ATR) — the document that confirms the grid can take on the requested power and which includes the technical solution and the corresponding connection fee.

What the grid connection fee consists of

The value of the fee depends on several technical factors and on the solution chosen by the operator. The main components are:

  • Approved power — a single-phase electrical connection (bransament) needs a smaller capacity than a three-phase one, so the connection cost is usually lower as well.
  • Distance to the existing grid — the farther the consumption point is from the low-voltage grid, the more the extension work costs.
  • Technical solution — an overhead connection is usually cheaper than an underground one; sometimes a grid extension or even a transformer station is required.
  • Type of consumption point — permanent (home, business) or temporary (construction site setup).
  • Grid reinforcement works — if the local grid needs to be strengthened to take on the requested power.

In short: the grid connection fee reflects the operator’s actual effort to bring grid capacity up to your property boundary.

The stages leading up to setting the fee

Before you find out the exact amount, you go through a fairly clear administrative path:

  1. Submitting the connection request together with the technical documentation (dossier and connection project).
  2. Issuing of the ATR by the operator, the document in which the connection fee and the technical solution appear.
  3. Signing the connection contract and paying the fee to the operator.
  4. Execution of the electrical connection by an ANRE-certified company (design + execution).
  5. Energisation and signing the supply contract.

Each stage has its own specific documents, and proper handling of the dossier significantly shortens the waiting time. You can find the details about this process on the page dedicated to grid connection for electricity and on the one about the Technical Connection Approval (ATR).

How much it costs, indicatively, in 2026

Important to remember: the grid connection fee owed to the operator is finally set through the ATR and differs from case to case. What we can present on an indicative basis are the costs of the design and execution works carried out by an ANRE-certified company such as SUN WATT.

ServiceIndicative cost (from)
Single-phase electrical connection1,800 lei
Three-phase electrical connection2,900 lei
Underground electrical connection3,500 lei
Temporary construction-site connection2,200 lei
Dossier + connection project900 lei
ATR assistance350 lei
Power upgrade (spor de putere)350 lei
Earthing electrode900 lei
PRAM checks250 lei

These values are indicative and do not include the grid connection fee itself, which is calculated separately by the operator. For an estimate tailored to your situation, you can use the electrical connection cost calculator or check the prices page.

Grid connection fee vs. the cost of the electrical connection

To avoid confusion, here are the two cost categories you will have:

1. What you pay the operator (Retele Electrice Romania)

  • The grid connection fee set through the ATR.
  • Any fees for analysing the request and issuing the approval.

2. What you pay the ANRE-certified company

  • Preparing the dossier and the connection project.
  • The materials and the actual execution of the electrical connection.
  • Related works: earthing electrode, PRAM checks, internal installation.

The two components are independent. You may receive a reasonable grid connection fee from the operator, but the execution cost depends on the technical solution and the complexity of the work — for example, an underground electrical connection involves digging and extra materials compared with an overhead one.

How you can reduce the total cost

  • Prepare the dossier correctly from the start — a well-drafted project avoids amendments and resubmissions that delay the ATR.
  • Choose the right technical solution — for many homes, a single-phase electrical connection covers the requirement; switch to three-phase only if you have appliances that demand it.
  • Anticipate future needs — if you are planning a heat pump or a photovoltaic system, it is more economical to size things correctly from the start than to later request a power upgrade.
  • Work with an ANRE-certified company — integrated handling of the dossier, project and execution reduces back-and-forth trips and wasted time.

Why SUN WATT

SUN WATT SRL is an ANRE-certified company for both the design and the execution of electrical connections and grid connections, covering Bucharest, Ilfov and Giurgiu, plus DIU (Utilisation Installation Dossier / proof of internal installation) nationwide. We handle the entire path: from preparing the dossier and obtaining the ATR, through to executing the electrical connection and energisation.

If you want to find out what grid connection fee applies to you and how much the complete work costs in your case, call 0733 097 440 or write to us via the contact page. We provide a clear assessment, with no surprises along the way.

Frequently asked questions

Is the grid connection fee the same for everyone?

No. The grid connection fee is set individually through the Technical Connection Approval (ATR), depending on the approved power, the distance to the grid, the technical solution (overhead or underground) and any grid reinforcement works. That is why the final value differs from case to case.

What is the difference between the grid connection fee and the price of the electrical connection?

The grid connection fee is the amount you pay the operator Retele Electrice Romania for connecting to the grid, set through the ATR. The price of the electrical connection (bransament) is the cost of the design work, materials and execution carried out by an ANRE-certified company. At SUN WATT, a single-phase connection starts from 1,800 lei, and a three-phase one from 2,900 lei.

When do I find out the exact amount of the grid connection fee?

The exact amount appears in the Technical Connection Approval (ATR), which the operator issues after the request and the connection dossier have been submitted. Until the ATR is issued, any figure is only an indicative estimate.

How much does preparing the dossier and the connection project cost?

At SUN WATT, the dossier together with the connection project starts from 900 lei, and assistance for obtaining the ATR from 350 lei. The final costs depend on the complexity of the situation and the type of electrical connection requested.

Can I reduce the grid connection fee?

The fee set by the operator depends on the technical solution, but you can optimise the total cost by choosing the power that suits your needs, preparing the dossier correctly from the start and anticipating future needs (for example a possible power upgrade / spor de putere). An ANRE-certified company can guide you towards the most efficient solution.

Need an electrical connection?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp