Electrical connections · Ilfov

Electrical connections in Afumați

SUN WATT SRL carries out single-phase (230V) and three-phase (400V) electrical connections (bransament) in the commune of Afumați, Ilfov County, as a firm certified by ANRE for design and execution. The distribution operator in the area is Retele Electrice Romania S.A., and we handle the entire process on a turnkey basis: the grid connection (racordare) application, obtaining the ATR (Technical Connection Approval), executing the connection and the DIU (Utilisation Installation Dossier). The indicative timeline from dossier to energisation (punere sub tensiune) in Afumați is around 4-12 weeks, with the final price confirmed through the ATR.

Afumați stretches eastwards from Bucharest, along the national road towards Urziceni, and has a distinct character compared with other communes in Ilfov: alongside the old village core and the older households, the main thoroughfare concentrates numerous car showrooms, industrial halls, warehouses and businesses, while the side streets are gradually filling up with subdivided plots and recently built houses. This mix generates connection requests with very different power requirements: from domestic connections for a newly completed house, to robust three-phase connections (bransament) for a workshop, a service garage or a commercial space on the main artery. We also frequently come across plots with no supply history, where the grid connection point sits at a distance from the gate, a situation that calls for a careful assessment of the route. SUN WATT, a firm certified by ANRE for design and execution, takes on the entire chain in Afumați: we submit the application to Retele Electrice Romania S.A. (formerly E-Distributie Muntenia), follow up on the technical connection approval (ATR), carry out the connection and prepare the Utilisation Installation Dossier (DIU) for the meter. We travel to the address, measure the distance to the grid and tell you clearly which option, single-phase or three-phase, suits you best.

Regardless of the type of consumer, the distribution operator for the area is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel), through which all connection requests are filed and the ATR (technical connection approval) is issued. As a spread-out commune, the usual solution is an overhead connection from the nearby low-voltage pole, the most economical option for households and plots on the side streets; however, on the stretches where the network has already been laid underground, or for higher-demand consumers along the main axis, buried connections are also carried out, resulting in a mixed system. For a new connection, the documents usually prepared are the urban planning certificate, the title deed or land registry extract, the site plan, and the connection request. From the filing of the complete dossier to energisation, the indicative duration is 4-12 weeks, depending on the operator's workload and the complexity of the work.

Services available in Afumați

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Afumați

Do you carry out three-phase connections for commercial spaces and workshops in Afumați?

Yes. Along the main artery in Afumați and the length of DN2, requests for three-phase connections (bransament, 400V) are common for service garages, showrooms, industrial halls and workshops, where the required power exceeds domestic consumption. We assess the actual power requirement, prepare the documentation and obtain the ATR (Technical Connection Approval) from Retele Electrice Romania, then carry out the connection with ANRE-certified personnel. The approved power and the tariff are confirmed through the technical connection approval (ATR).

I have a new plot in Afumați with no electricity, far from the grid. Can a connection be made?

Yes, but on plots with no supply history the distance from the property boundary to the operator's nearest connection point matters a great deal. When the grid is some distance away, an extension may be needed, which affects the duration and cost of the work. We travel to Afumați, measure the route and establish the technical solution, with the final tariff then resulting from the ATR.

Who issues the connection approval in Afumați and who handles the dossier?

The Technical Connection Approval (ATR) is issued by the local distribution operator, Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel). SUN WATT, a firm certified by ANRE, prepares and submits the grid connection dossier on your behalf and manages the relationship with the operator, from the application through to meter installation and energisation (punere sub tensiune), so you do not have to deal with the bureaucracy yourself.

Need an electrical connection in Afumați?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp