Electrical connections · Ilfov

Electrical connections in Mogoșoaia

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Mogoșoaia, Ilfov county, as a company certified by ANRE for design and execution. We work with the grid operator Retele Electrice Romania S.A. and manage the connection dossier from submission through to energisation (punere sub tensiune). For appointments and information, call 0733 097 440.

Mogoșoaia is a commune in the north of Ilfov county, undergoing continuous residential development, with numerous parcelled plots, new houses and housing developments built in recent years around Mogoșoaia Palace and along the roads towards Buftea and Chitila. Here, the most frequent requests come from owners building a new house who need a permanent electrical connection (bransament), as well as from those wanting a site connection (temporary) for the duration of the works, or from households that want to increase their installed power (spor de putere) for a heat pump, a photovoltaic system or higher-power appliances. SUN WATT SRL, a company certified by ANRE for design and execution, covers the entire commune of Mogoșoaia and travels to the site to assess the situation, prepare the project and the connection dossier for Retele Electrice Romania, and then to carry out the actual installation of the connection cabinet (firida de bransament), the distribution board and the earthing system, through to energisation.

The distribution operator serving the commune is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel), to which all connection requests are submitted and through which the technical connection approval (ATR) is obtained. Being a predominantly residential area of a rural-periurban type, the usual solution remains the overhead connection from the existing pole of the low-voltage network, which is more economical and faster to carry out; however, in the new plots where the local network has been laid underground, buried connections are also made, resulting in a mixed character. For a new connection, the urban planning certificate, the proof of ownership or the land registry extract, the site plan, and the connection request are generally required. As an indicative figure, between 4 and 12 weeks pass from the filing of the complete dossier until energisation, the interval varying depending on the operator and the complexity of the work.

Services available in Mogoșoaia

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Mogoșoaia

How long does an electrical connection take in Mogoșoaia?

The duration depends on the approval and schedule of the operator Retele Electrice Romania and on the complexity of the works. The part that is up to us (the design, the connection dossier and the execution) we prepare quickly after our visit to Mogoșoaia; we can estimate the exact timescales on site. Call 0733 097 440 for an assessment.

Do you also do a site connection (temporary) for a house under construction in Mogoșoaia?

Yes. For new houses in Mogoșoaia we carry out both temporary site connections, needed during construction, and the permanent connection once the work is completed, together with the preparation of the related documentation for Retele Electrice Romania.

Which areas of Mogoșoaia do you cover?

We cover the whole commune of Mogoșoaia, including the new plots and residential developments near Mogoșoaia Palace and along the directions towards Buftea and Chitila. We travel to the address for assessment and execution; schedule a visit on 0733 097 440.

Need an electrical connection in Mogoșoaia?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork