Grădiștea is a commune in the north of Ilfov county, in the plains area around Bucharest, with a predominantly residential character and households arranged along the local roads. As new houses and building plots appear on the parcelled land, more and more property owners in Grădiștea need a new electrical connection (bransament) to link their home to the distribution grid. SUN WATT SRL covers these typical situations: a single-phase connection for an ordinary house, a three-phase connection where there are larger consumers, the connection of a construction site or a household outbuilding, as well as a power upgrade (spor de putere) to the installed capacity of an existing home. As a company certified by ANRE for both design and execution, we handle the entire administrative and technical process: we draw up the documentation, submit the dossier to Retele Electrice Romania S.A., carry out the work on site and prepare the installation for energisation (punere sub tensiune). We travel to Grădiștea and its belonging villages, as well as to the neighbouring localities in Ilfov, so the owner does not have to coordinate the stages with the distribution operator on their own.
The distribution operator for Grădiștea is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia, part of the Enel group), through which all connection requests are filed and the technical connection approval (ATR) is obtained. Being a plains commune, with households spread out along the roads, the usual and most economical solution is the overhead connection run from the existing pole on the local network, although on the stretches where the line is buried an underground connection can also be carried out. For a new connection one typically prepares the urban planning certificate, the title deed or the land registry extract, the site plan and the properly completed connection request. As a rough guide, from the filing of the dossier to energisation it normally takes between 4 and 12 weeks, depending on the operator's schedule and the complexity of the work.
Services available in Grădiștea
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.