Corbeanca is one of the top residential communes in northern Ilfov, with a character dominated by houses and villas on generous plots, spread across the villages of Tamasi, Petresti and Ostratu and the new subdivisions that have appeared along the roads towards Balotesti and Tunari. Here, the typical situation we come across is not the apartment block but the single-family home on its own land: a newly built house that still has no power, a building site that first needs a temporary connection and then the permanent one, or a household that requests a power upgrade (spor de putere) after installing a heat pump, an extended air-conditioning system or an EV charging station. On more secluded plots, the distance from the property boundary to the nearest grid pole can be greater, which is why we choose the right solution together with you - an overhead connection where there is a grid on poles nearby, or an underground one, with excavation and a protective conduit, in areas where a more discreet option is preferred. SUN WATT, a firm certified by ANRE for design and execution, covers the entire commune of Corbeanca and travels to your address to assess the position relative to the grid and the actual power requirement, recommending single-phase (230V) for ordinary household consumption or three-phase (400V) for large consumers. We handle everything, from dossier to pole: the grid connection request to Retele Electrice Romania, follow-up of the Technical Connection Approval (ATR), the contract, the design and execution of the connection, plus the Utilisation Installation Dossier (DIU) required for fitting the meter.
The distribution operator for Corbeanca is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel), the body through which all connection requests are filed and the technical connection approval (ATR) is obtained, the mandatory step before any work on the network. Being a predominantly rural and residential commune, the usual solution on the plots in Tamași, Petrești, Ostratu or in the newer subdivisions remains the overhead connection from the existing pole, the more economical and faster option, although on streets where the network is buried an underground connection is also carried out. For a complete file, the operator generally requires the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the connection application. As a guideline, from filing the dossier to energisation it normally takes between 4 and 12 weeks, the duration varying according to the operator and the complexity of the work.
Services available in Corbeanca
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.