Bragadiru is one of the towns in the south-west of Ilfov County undergoing rapid expansion, with numerous residential developments, detached houses and newly subdivided plots on the edge of Bucharest. In areas like these, the need for an electrical connection (bransament) arises frequently: newly built houses that must be connected to the grid for the first time, plots where work is about to start and that require a site connection, or households increasing their installed power following extensions. SUN WATT SRL covers the entire town of Bragadiru, including the neighbourhoods and streets currently under development, travelling on site to carry out assessments and measurements. As a company certified by ANRE for both design and execution, we take care of the whole technical process: preparing the documentation, the connection design, installing the connection cabinet (firida de bransament) and the grid connection installation, as well as coordinating with the distribution operator Retele Electrice Romania right through to energisation (punere sub tensiune). In this way, customers in Bragadiru avoid unnecessary trips and complicated bureaucratic steps, having a single point of contact for the entire process.
At an administrative level, the grid connection in Bragadiru is carried out through the distribution operator Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel), to which all connection requests are submitted and which issues the ATR (technical connection approval) required for any work. Being a locality of a mixed character, the technical solution differs from one street to another: on densely built-up arteries and in the new residential developments, where the local network is buried, the connection is frequently made underground, whereas on the more isolated plots and in the areas with a rural character the overhead connection from the existing pole remains the usual, more economical option. For a new connection, the dossier generally includes the urban planning certificate, the title deed or the land registry extract, the site plan and the connection request. As an indication, between the submission of the complete dossier and energisation, 4 to 12 weeks elapse, depending on the operator's schedule and the complexity of the work.
Services available in Bragadiru
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.