Electrical connections in Brănești

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Brănești, Ilfov county, as an ANRE-certified company for design and execution. We prepare the complete technical file and manage the relationship with the grid operator Retele Electrice Romania, for the safe connection of your home or premises.

Brănești is a fast-developing commune in the eastern part of Ilfov county, located along the DN3 national road, with a mix of older households on the established lanes and newly subdivided plots for houses in the expanding neighbourhoods. This combination creates the typical situations SUN WATT handles: a newly built house that needs its first permanent connection (bransament) after relying only on a construction-site supply, an older household where the panel and the main feeder can no longer cope with current consumption, or a freshly purchased plot where the low-voltage network runs nearby and a new connection has to be made. For the residents of Brănești, including the belonging villages such as Islaz and Vasilați-margine, we take care of the entire process: we determine the technical solution based on the position of the pole and the requested power (single-phase or three-phase), prepare the design documentation and submit the grid connection (racordare) application to Retele Electrice Romania, then carry out the work in accordance with the approval. Being a short distance from the eastern part of Bucharest, travel to Brănești is quick, and for the initial assessment we come on site to see exactly the configuration of the plot and of the local network.

All steps for a new consumption point go through the distribution operator Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel), the entity that issues the technical connection approval (ATR) underpinning any permanent supply. Being a locality with a predominantly rural profile, in Brănești the usual solution remains the overhead connection from an existing pole of the low-voltage network, the most economical option for lanes and house plots, although on the sections where the network is buried an underground connection can also be carried out. For filing the dossier you generally need the urban planning certificate (certificat de urbanism), the title deed or land registry extract (extras CF), the site plan (plan de situație) and the completed connection request (cerere de racordare). From registration of the complete dossier through to actual energisation, the indicative duration usually falls between 4 and 12 weeks, depending on the operator and the complexity of the works.

Services available in Brănești

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Brănești

How quickly do you reach Brănești for an assessment?

Brănești is in the eastern part of Ilfov, close to the exit from Bucharest on the DN3, so travel is quick. For an on-site assessment, call 0733 097 440 and we will arrange a visit during which we check the position of the plot relative to the network and the power you need.

I have a new house in Brănești with no electricity. What do I need to do for the connection?

For a newly built house in Brănești without a permanent connection (bransament), we handle everything: we determine the technical solution (single-phase or three-phase), prepare the design file and submit the grid connection (racordare) application to Retele Electrice Romania, then carry out the work once the approval is obtained. You provide us with the ownership documents and identification details.

Do you also do three-phase connections for workshops or premises in Brănești?

Yes. For workshops, farms or commercial premises in Brănești with higher consumption, we size and install three-phase connections (bransament), choosing the solution suited to the requested power. As an ANRE-certified company for design and execution, we cover both the documentation and the actual work.

Need an electrical connection in Brănești?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp