Electrical connections · Ilfov

Electrical Connections in Găneasa, Ilfov

SUN WATT SRL carries out new electrical connections (bransament) and grid connections (racordare) in the commune of Găneasa, Ilfov, as a company certified by ANRE for both design and execution. We work with the distribution operator Retele Electrice Romania S.A. and cover all the villages of the commune. Bookings on 0733 097 440.

The commune of Găneasa lies in the eastern part of Ilfov county, on the border with Ialomița county, and comprises the villages of Găneasa, Cozieni, Moara Domnească, Piteasca and Șindrilița. It is an area where more and more housing plots, homesteads and small production or storage spaces are being developed, situations in which a new electrical connection (bransament) becomes the first prerequisite for being able to live or work on the land. SUN WATT SRL, a company certified by ANRE for both design and execution, handles the entire course of a connection in Găneasa: from preparing the technical documentation and submitting the grid connection (racordare) application to Retele Electrice Romania S.A., through to carrying out the actual works and energisation (punere sub tensiune). We cater equally to owners of new houses who do not yet have power on the land, to those who want to switch from a single-phase to a three-phase connection for larger consumers, and to those who need a temporary site connection during the construction phase. Thanks to our close proximity to Bucharest and the other communes in eastern Ilfov, we travel quickly to all the villages of the commune of Găneasa for on-site assessment and no-obligation advice. For details and an estimate tailored to your situation, you can contact us on 0733 097 440.

The distribution operator for this part of Ilfov county is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel), and both the connection request and the technical connection approval (ATR) — which sets the solution and parameters of the connection — pass through this operator. Being a commune with scattered villages and households, in Găneasa the most frequent and most economical solution remains the overhead connection, made from the existing network pole, although on the stretches where the local network is buried an underground variant may also be required. For a new consumption point, the documents usually requested are the urban planning certificate, the title deed or land registry extract, the site plan and the connection request, which we prepare together with the beneficiary. As an indication, from the filing of the complete dossier to the actual energisation it usually takes between 4 and 12 weeks, depending on the operator's deadlines and the complexity of the work.

Services available in Găneasa

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Găneasa

Do you carry out electrical connections in all the villages of the commune of Găneasa?

Yes. We cover the entire commune of Găneasa in Ilfov, including the villages of Găneasa, Cozieni, Moara Domnească, Piteasca and Șindrilița. We travel to the site for assessment and can take on the entire connection process. Call 0733 097 440 to make a booking.

How long does a new electrical connection in Găneasa take?

The duration depends on the type of connection (single-phase or three-phase), the complexity of the connection and the timeframes of the operator Retele Electrice Romania S.A. for approvals and energisation (punere sub tensiune). SUN WATT prepares the documentation and execution so that the works can progress without unnecessary steps; we provide you with a realistic estimate once we have seen the situation of the land.

Do you need a temporary connection for a house under construction in Găneasa?

Yes, we can provide temporary site connections for houses under construction in Găneasa, with the subsequent transition to the permanent connection. As an ANRE-certified company, we handle both design and execution. Details on 0733 097 440.

Need an electrical connection in Găneasa?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp