Electrical connections · Ilfov

Electrical connections in Tunari

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Tunari, Ilfov County, as an ANRE-certified company for design and execution. The works are completed in cooperation with the distribution operator Retele Electrice Romania S.A., for new homes, power upgrades and commercial premises.

Tunari is a commune in the north of Ilfov County, in the midst of rapid residential development, with numerous parcelled plots and new housing developments appearing year after year close to Bucharest. In areas like this, the need for an electrical connection (bransament) is one of the first formalities owners have to deal with: a newly built house or a plot prepared for construction must be connected to the distribution grid before it can be lived in or used. SUN WATT SRL, an ANRE-certified company for design and execution, handles the entire journey of a connection in Tunari, from the technical documentation and the technical connection approval (aviz tehnic de racordare) through to the actual execution of the work and energisation (punere sub tensiune). Beyond individual homes, we also carry out power upgrades (spor de putere) where the existing connection can no longer cope with consumption, as well as work for commercial premises, warehouses or office spaces in the commune's economic areas. The distribution operator in the area is Retele Electrice Romania S.A., and the works are coordinated in accordance with the requirements and stages it imposes. Our team can reach Tunari and the neighbouring localities in Ilfov quickly, thanks to the proximity to Bucharest.

All connection requests in Tunari are filed with Rețele Electrice România S.A. (formerly E-Distribuție Muntenia, part of the Enel group), the operator that issues the technical connection approval (ATR) on the basis of which the work can be carried out. As a predominantly residential commune in Ilfov, the usual solution is the overhead connection, made from the existing low-voltage pole, the most economical option for housing plots; in the areas where the local network has been buried, the connection can also be made underground, so mixed situations occur from one street to another. For a new connection the following are generally required: the urban planning certificate (certificat de urbanism), the property deed or land register extract (extras CF), the site plan (plan de situație) and the connection request (cerere de racordare), documents that we prepare together with the owner. From the filing of the complete dossier to the actual energisation, the indicative duration of the whole process is roughly 4-12 weeks, depending on the operator's pace and the complexity of each case.

Services available in Tunari

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Tunari

Do you carry out electrical connections for new houses in Tunari?

Yes. SUN WATT carries out electrical connections (bransament) for newly built homes in Tunari, Ilfov. We handle design, documentation and execution, in cooperation with the operator Retele Electrice Romania S.A., so that the house is connected to the grid and energised.

Who is the distribution operator for a connection in Tunari?

In Tunari and across the rest of Ilfov County, the distribution operator is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel). SUN WATT carries out the connection works in line with the stages and approvals required by this operator.

Can I request a power upgrade for an existing connection in Tunari?

Yes. If your current connection no longer covers the consumption of your home or premises in Tunari, we can handle the design and execution for a power upgrade (spor de putere). Call 0733 097 440 to discuss your specific situation.

Need an electrical connection in Tunari?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp