Electrical connections · Ilfov

Electrical Connections in Dărăști-Ilfov

SUN WATT carries out electrical connections (bransament) and grid connections in Dărăști-Ilfov as an ANRE-certified company for design and execution. The works are carried out in coordination with the distribution operator Retele Electrice Romania, from the application file through to energisation.

Dărăști-Ilfov is a commune in the south of Ilfov county, on the edge of Bucharest, with residential areas under constant development and plots where more and more new houses are being built. For these constructions, the electrical connection (bransament) is one of the first necessary steps, whether it is a matter of a new connection for a recently completed home, a power upgrade (spor de putere) to the contracted capacity of an existing household, or a connection for an outbuilding, a workshop or a small commercial space. SUN WATT, an ANRE-certified company for design and execution, handles the entire journey in Dărăști-Ilfov: assessing the situation on site, drawing up the technical documentation, submitting and following up the application file with the operator Retele Electrice Romania, the actual execution of the connection and preparation for energisation (punere sub tensiune). We cover both the areas close to the main road and the more secluded streets and the new plot developments in the commune, with a site visit to determine the right solution for each property.

In Dărăști-Ilfov, all connection requests and the issuing of the technical connection approval (ATR) are handled through the distribution operator Rețele Electrice România S.A., the entity that took over the former E-Distribuție Muntenia (Enel) and which manages the network in this area. Being a predominantly residential and rural commune, the usual solution remains the overhead connection, made from the existing pole near the property, the most economical and fastest option; however, on the stretches where the local network is already buried, the underground connection can be chosen, so that in practice you often encounter both situations. For a new connection, the file typically includes the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the connection request, documents that we prepare together with the beneficiary. As a rough guide, from filing the dossier to actual energisation the total duration falls within a range of 4 to 12 weeks, depending on the operator's pace and the complexity of the work.

Services available in Dărăști-Ilfov

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Dărăști-Ilfov

How long does a new electrical connection take in Dărăști-Ilfov?

The duration depends mainly on the processing time of the application file with the operator Retele Electrice Romania and on the type of connection. SUN WATT handles the design and execution in order to speed up the part that is down to us, but the approval and energisation stages follow the distribution operator's procedures. During a site visit in Dărăști-Ilfov we can give you a more accurate estimate of the timeframes for your case.

What do I need to do for a connection to a new house in Dărăști-Ilfov?

The first step is an on-site assessment, after which we draw up the necessary technical documentation and submit the application file to Retele Electrice Romania. You will need the property documents and the owner's identification details. SUN WATT, ANRE-certified, guides you through all the stages so that you do not have to handle the technical formalities on your own.

Do you also carry out power upgrades, or only new connections in Dărăști-Ilfov?

We carry out both new connections and power upgrades (spor de putere), connections for outbuildings and modernisation of existing installations in Dărăști-Ilfov. For a power upgrade we analyse the current installation and prepare the documentation required by the operator Retele Electrice Romania. Call 0733 097 440 for details.

Need an electrical connection in Dărăști-Ilfov?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp