Periș is a commune in the north of Ilfov county, set along the Bucharest-Ploiești axis (DN1), on the edge of the forests and the Snagov area, with the dependent villages of Bălteni and Burias. It has a predominantly rural character, with traditional households and, in recent years, an increasing number of plots split off from agricultural land on which new houses, family homes and outbuildings are now being built. On plots such as these, the connection is not always right next to the existing network, and the distance to the nearest pole can influence the technical solution and the tariff, which is why an on-site assessment is important. SUN WATT SRL carries out electrical connections and grid connections in Periș and in the commune's villages, as a company certified by ANRE for design and execution. We handle the entire journey "from dossier to pole": we submit the connection request together with the necessary documents, we follow up on the issuing of the Technical Connection Approval (ATR) by the grid operator Retele Electrice Romania S.A., we carry out the design and execution of the electrical connection (overhead or underground) and we prepare the Utilisation Installation Dossier (DIU) for meter installation. Here we frequently come across houses under construction that first need a temporary site connection and then the permanent one, as well as households moving from single-phase to three-phase for heat pumps, workshops or EV charging stations. We travel throughout the commune for the assessment, so that the owner does not have to manage the bureaucracy with the operator on their own.
At the administrative level, all connection requests and the issuance of the ATR (technical connection approval) are handled through the distribution operator Rețele Electrice România S.A., the company that took over the former E-Distribuție Muntenia (Enel). Given the predominantly rural character of the locality, the usual solution for households and new homes in Periș, Bălteni and Burias is the overhead connection, run from the existing low-voltage network pole, a more economical and faster option; where the local network is laid underground, a buried connection can also be chosen. To open the file, the following are generally required: the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the completed connection application. From the submission of the complete file to the actual energisation, the indicative duration of the process is roughly 4-12 weeks, depending on the operator's pace and the complexity of the works.
Services available in Periș
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.