Electrical connections · Ilfov

Electrical connections in Periș

SUN WATT SRL carries out single-phase (230V) and three-phase (400V) electrical connections in Periș, Ilfov county, as a company certified by ANRE for design and execution. We handle the entire connection process to the network of the grid operator Retele Electrice Romania S.A., from the connection request and the Technical Connection Approval (ATR) through to meter installation and energisation. The indicative timeframe, from dossier to energisation, is approximately 4-12 weeks, while the final tariff is confirmed through the ATR.

Periș is a commune in the north of Ilfov county, set along the Bucharest-Ploiești axis (DN1), on the edge of the forests and the Snagov area, with the dependent villages of Bălteni and Burias. It has a predominantly rural character, with traditional households and, in recent years, an increasing number of plots split off from agricultural land on which new houses, family homes and outbuildings are now being built. On plots such as these, the connection is not always right next to the existing network, and the distance to the nearest pole can influence the technical solution and the tariff, which is why an on-site assessment is important. SUN WATT SRL carries out electrical connections and grid connections in Periș and in the commune's villages, as a company certified by ANRE for design and execution. We handle the entire journey "from dossier to pole": we submit the connection request together with the necessary documents, we follow up on the issuing of the Technical Connection Approval (ATR) by the grid operator Retele Electrice Romania S.A., we carry out the design and execution of the electrical connection (overhead or underground) and we prepare the Utilisation Installation Dossier (DIU) for meter installation. Here we frequently come across houses under construction that first need a temporary site connection and then the permanent one, as well as households moving from single-phase to three-phase for heat pumps, workshops or EV charging stations. We travel throughout the commune for the assessment, so that the owner does not have to manage the bureaucracy with the operator on their own.

At the administrative level, all connection requests and the issuance of the ATR (technical connection approval) are handled through the distribution operator Rețele Electrice România S.A., the company that took over the former E-Distribuție Muntenia (Enel). Given the predominantly rural character of the locality, the usual solution for households and new homes in Periș, Bălteni and Burias is the overhead connection, run from the existing low-voltage network pole, a more economical and faster option; where the local network is laid underground, a buried connection can also be chosen. To open the file, the following are generally required: the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the completed connection application. From the submission of the complete file to the actual energisation, the indicative duration of the process is roughly 4-12 weeks, depending on the operator's pace and the complexity of the works.

Services available in Periș

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Periș

Do you carry out electrical connections in the villages of Periș commune, not just in the centre?

Yes. We cover the entire Periș commune, including the villages of Bălteni and Burias, as well as the new plots on the edge of the forest and areas at some distance from the existing network. We travel to your address for a free assessment, check the distance to the nearest connection point and determine the right solution, single-phase or three-phase, overhead or underground.

How long does an electrical connection take for a new house in Periș?

As a guide, from the submission of the dossier to energisation the process takes approximately 4-12 weeks. The Technical Connection Approval (ATR) from Retele Electrice Romania is usually obtained within a few weeks, after which come the connection contract, the design and execution of the electrical connection, the Utilisation Installation Dossier (DIU) and meter installation. The timeframes depend on the complexity of the connection and on the operator's processing times.

On a plot in Periș that is far from the network, can I still be connected?

Yes, but the solution and the cost depend on the distance to the existing network. On the new plots in Periș, often split off from agricultural land, a network extension or an underground connection with excavation may be necessary, and these are reflected in the conditions and tariff set through the ATR. During the free on-site assessment we check the exact situation and explain the steps through to energisation.

Need an electrical connection in Periș?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp