Moara Vlăsiei is a quiet commune in the north of Ilfov County, also taking in the villages of Căciulați and Cozieni, an area with a semi-rural character where plots are more generous and households are more spread out than in the communes adjoining Bucharest. It is precisely this characteristic that means, when someone builds a house on a vacant plot or buys a parcel without utilities, the distance from the property boundary to the nearest network pole has a direct bearing on the technical solution and on the cost. SUN WATT, a company certified by ANRE for design and execution, carries out in Moara Vlăsiei new electrical connections (bransamente) for privately owned homes being connected for the first time, temporary site connections for the duration of construction, as well as upgrades from single-phase (230V) to three-phase (400V) where heat pumps, workshops or car charging stations are being installed. The distribution operator in the area is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel), and we prepare the grid connection request, follow up the issuing of the Technical Connection Approval (ATR), carry out the design and execution of the connection, and prepare the Utilisation Installation Dossier (DIU) for fitting the meter. We travel throughout the commune and the associated villages for an on-site assessment, so that we can determine together the right option and so that you receive a clear quote, without having to manage the relationship with the operator on your own.
The distribution operator for this part of Ilfov county is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia, previously Enel), and it is through this operator that all connection requests pass and the technical connection approval (ATR) is issued. Being a commune of semi-rural character, the usual solution for Moara Vlăsiei and its attached villages remains the overhead connection from the existing network pole, which is more economical and quicker to carry out, although in areas where the local network has already been buried the underground variant can also be executed, giving rise to mixed situations. For a new connection, the documents normally required are the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the connection application. From the filing of the complete dossier to energisation, the indicative duration is 4-12 weeks, depending on the operator's pace and the complexity of the work.
Services available in Moara Vlăsiei
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.