Electrical connections · Ilfov

Electrical connections in Otopeni

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Otopeni (Ilfov), both single-phase (230V) and three-phase (400V), as a firm certified by ANRE for design and execution. We handle the entire connection dossier, from the application and obtaining the Technical Connection Approval (ATR) through to energisation (punere sub tensiune). The distribution operator in Otopeni is Retele Electrice Romania S.A.

Otopeni is a small town in the north of Ilfov county, developed along the road towards Henri Coanda Airport, where quiet residential streets of houses blend with recent housing developments, freshly subdivided plots and a growing commercial and logistics area. This pace of construction makes the electrical connection (bransament) one of the first concrete steps for anyone putting up a house at the structural stage, finishing a villa or laying the foundations for a business premises. SUN WATT SRL, a firm certified by ANRE for design and execution, manages the entire process in Otopeni: we prepare the connection application and the documents, assist with obtaining the Technical Connection Approval (ATR) from Retele Electrice Romania S.A., carry out the overhead or underground connection and compile the Utilisation Installation Dossier (DIU) for meter installation. For households with ordinary consumption we usually recommend the single-phase option, while for large homes, heat pumps, workshops or commercial premises we recommend the three-phase option. As Otopeni is a locality right on the edge of Bucharest, we travel quickly to your address there for a free on-site assessment, after which we tell you clearly which technical solution suits you and what the next steps are. In short, we spare you the trips to the operator and the bureaucracy and guide you, hassle-free, from paperwork to power at the socket.

All connection requests and the issuance of the technical connection approval (ATR) for Otopeni are handled through Rețele Electrice România S.A., the distribution operator that took over the former E-Distribuție Muntenia (Enel) and manages the network in this part of Ilfov county. Being a town with a mixed configuration, the connection solution varies from one street to another: along the main thoroughfares and in the new residential developments, where the network has been buried, the connection is frequently made underground, while in the areas of older houses and on the plots toward the edge of the locality the overhead connection from the existing pole remains the usual and more economical option. For a new consumption point, the documents typically required are the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the connection application, all of which we prepare and file in full on the client's behalf. From the submission of the complete dossier to the actual energisation, the indicative duration is 4-12 weeks, depending on the operator's schedule and the complexity of the works.

Services available in Otopeni

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Frequently asked questions — connections in Otopeni

Do you carry out electrical connections in Otopeni for new houses and construction projects?

Yes. In Otopeni we frequently carry out connections for houses at the structural stage, finished villas and new residential developments, both single-phase and three-phase. We handle the entire chain: the connection application, assistance for the ATR, the execution of the overhead or underground connection and the Utilisation Installation Dossier (DIU) required for meter installation. Call 0733 097 440 for a free assessment at your address.

How long does an electrical connection take in Otopeni?

The actual execution of the connection in Otopeni can be completed within a few days once we have the approvals. The longest step is obtaining the Technical Connection Approval (ATR) from Retele Electrice Romania, which takes roughly a few weeks. In total, from submitting the dossier through to energisation, you can expect a timeframe of approximately 4-12 weeks, depending on the operator and the complexity of the work.

Who issues the connection approval in Otopeni and who handles the dossier?

The Technical Connection Approval (ATR) is issued by the area's distribution operator, Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel). SUN WATT SRL, as a firm certified by ANRE, compiles and submits the dossier on your behalf and manages the relationship with the operator, so that you do not need to travel to any counters.

Need an electrical connection in Otopeni?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp