Bolintin-Deal is a commune in the western part of Giurgiu County, crossed by the DN6 road and by the corridor of the A1 Bucharest-Pitesti motorway, which makes it one of the areas with high demand for building plots among people who work in the Capital but want to live in a house with a yard. Across its constituent villages, Bolintin-Deal and Mihai Voda, new plot subdivisions are appearing more and more often where each lot needs its first electrical connection (bransament), but there are also older households increasing their installed power or switching from single-phase to three-phase. SUN WATT, a company certified by ANRE for design and execution, carries out single-phase (230V) and three-phase (400V) connections for homes, outbuildings, workshops and small investments in the commune. The distribution operator in the area is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel), and we take care of all the paperwork: we draw up the grid connection request, follow up on the issuing of the Technical Connection Approval (ATR), prepare the contract, design and execute the connection, then compile the Utilisation Installation Dossier (DIU) up to the fitting of the meter and energisation. On plots further from the grid, we check the distance to the nearest pole well in advance, so that the proposed solution is realistic. We travel out to Bolintin-Deal and the neighbouring villages, so you don't have to run between counters on your own.
For any new connection in Bolintin-Deal, the competent distribution operator is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia, part of the Enel group), and it is through this operator that all connection requests are filed and the ATR (technical connection approval) is obtained. Being a predominantly rural commune, the usual and more economical solution remains the overhead connection, run from the existing pole of the low-voltage network, although in the newer parcelled-out plots mixed sections may also appear, where the local network is partly buried. The technical dossier normally requires the urban planning certificate, the title deed or the land registry extract, the site plan and the connection request itself. From the filing of the complete dossier until the actual energisation, the indicative duration falls within 4-12 weeks, depending on the operator's workload and the complexity of the works.
Services available in Bolintin-Deal
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.