Electrical connections · Giurgiu

Electrical connections in Gostinu

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Gostinu, Giurgiu County, as an ANRE-certified company for both design and execution. We handle the connection dossier submitted to Retele Electrice Romania and the actual work, all the way to energisation (punere sub tensiune). We are available on 0733 097 440.

Gostinu is a commune in the south of Giurgiu County, located in the floodplain area near the Danube, with a predominantly rural character and large households spread along the main roads. In localities such as these, the need for an electrical connection (bransament) most often arises at newly built houses erected on land outside the built-up area or on plots that previously had no power supply, but also at site-establishment works, agricultural outbuildings or properties moving from a temporary connection to a permanent one. SUN WATT SRL, a company certified by ANRE for both design and execution, covers the commune of Gostinu and its attached villages, travelling on site to assess the distance to the low-voltage grid and to determine the appropriate technical solution, whether a single-phase or a three-phase connection. We handle the entire process, from drawing up and submitting the connection dossier to the operator Retele Electrice Romania, through to installing the connection cabinet (firida de bransament) and the meter and carrying out energisation (punere sub tensiune), so that owners in Gostinu do not have to make repeated trips to the distributor's offices.

The distribution operator for Gostinu is Rețele Electrice România S.A., a company formerly known as E-Distribuție Muntenia (previously Enel), through which all connection requests are filed and the technical connection approval (ATR) is obtained. Given the village's rural layout and the households spread out along the roads, the connection is usually made overhead, from an existing pole of the nearby network, a solution that is more economical and quicker to carry out than the underground option encountered in dense urban areas. For a new connection a standard set of documents is normally required, namely the urban planning certificate, the title deed or land registry extract, the site plan and the connection request. From the submission of the complete dossier to the actual energisation, the indicative duration of the whole process is approximately 4-12 weeks, depending on the operator's schedule and the complexity of the works.

Services available in Gostinu

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Electrical connections across Giurgiu

Frequently asked questions — connections in Gostinu

How long does an electrical connection take in Gostinu?

The timeframe depends mainly on the approval time of the operator Retele Electrice Romania and on the complexity of the work (single-phase or three-phase, distance from the grid). SUN WATT prepares and submits the connection dossier, and the actual execution part is usually quick once the technical connection approval (ATR - aviz tehnic de racordare) has been issued. For a concrete estimate for your address in Gostinu, call 0733 097 440.

What documents do I need to connect a new house in Gostinu?

In general, you will need the title deed for the land, the applicant's identity document, the urban planning certificate or the building permit, as well as a site plan. SUN WATT will tell you exactly which documents are required in your case and takes care of drawing up and submitting the connection dossier to Retele Electrice Romania.

Do you also travel to the villages of Gostinu commune?

Yes. SUN WATT covers the commune of Gostinu and the neighbouring localities in Giurgiu County, as well as the Giurgiu, Ilfov and Bucharest area. We travel on site to assess the connection solution and the estimated costs. To make an appointment, you can contact us on 0733 097 440.

Need an electrical connection in Gostinu?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp