Prundu is a commune in the south of Giurgiu county, located near the Danube and its floodplain, an area where many households sit on large plots, with individual houses and agricultural outbuildings. Here, the electrical connection (bransament) most often comes up in three situations: a new house built on a plot without utilities, an older dwelling moving from a temporary connection to a permanent one, or a household that needs additional power (spor de putere) for irrigation pumps, workshops or electric heating. SUN WATT SRL, an ANRE-certified company for design and execution, takes care of the entire process: preparing the grid connection dossier for Retele Electrice Romania S.A., the technical design, fitting the connection cabinet (firida de bransament) and the panel, through to energisation (punere sub tensiune). Travelling to Prundu and its component villages is no problem, as it is a locality within our usual working area in Giurgiu county. For a clear estimate of the steps and documents required, you can contact us on 0733 097 440.
The distribution operator for this part of Giurgiu county is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia, part of the Enel group), the entity through which connection requests are filed and the technical connection approval (ATR) is obtained, a mandatory step before any work. Being a commune with wide frontages and extensive plots, the connection is usually carried out overhead, via a service line drawn from the existing pole on the low-voltage network closest to the property, a faster and more economical solution than the underground option. The technical dossier typically requires the urban planning certificate, the title deed or land registry extract, the site plan and the connection request, documents we prepare together with the client to avoid delays. From the complete filing of the dossier until the actual energisation, the indicative duration is roughly 4-12 weeks, the range varying according to the operator's workload and the complexity of the work.
Services available in Prundu
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.