Crevedia Mare is a commune in the west of Giurgiu County, in the plain crossed by the Neajlov river, made up of several constituent villages (among them Crevedia Mare, Crevedia Mica, Dealu, Gaiseanca, Priboiu and Sfantu Gheorghe). Its rural character and scattered households mean that the typical requests are varied: a house built on a plot at the edge of the village that does not yet have a supply, the replacement of an old riser or of an old electrical connection (bransament) that can no longer cope, or the installation of a heat pump or an EV charging station, a situation in which one moves from a single-phase to a three-phase connection. SUN WATT SRL, a company certified by ANRE for design and execution, takes on the entire process in Crevedia Mare: it submits the grid connection (racordare) application with the relevant documents, follows up on the issuing of the Technical Connection Approval (ATR) by Retele Electrice Romania (formerly E-Distributie Muntenia / Enel), designs and installs the overhead or underground electrical connection, then draws up the Utilisation Installation Dossier (DIU) required for the meter. For plots located at a distance from an existing pole, we assess on site the route and any grid extension before deciding on the solution. We take you all the way to energisation (punere sub tensiune), without you having to handle the discussions with the distributor on your own.
The distribution operator for this area is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel), through which all connection requests are submitted and the ATR (technical connection approval) is obtained. Being a commune made up of several component villages and scattered households, the usual solution is the overhead connection run from the existing low-voltage pole, the most economical option for this rural-type network, although in the village cores where the routes are buried underground connections or mixed situations may also occur. For a new connection, the dossier generally includes the urban planning certificate, the proof of ownership or land registry extract, the site plan and the connection request. As a guide, from the filing of the complete dossier to energisation, between 4 and 12 weeks elapse, depending on the operator's workload and the complexity of the works.
Services available in Crevedia Mare
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.