Singureni is a commune in the central part of Giurgiu county, made up of several villages, with a predominantly rural character and households spread out along the main roads. In areas like this, the need for an electrical connection (bransament) most often arises at newly built houses, at plots being developed for the first time, or at household outbuildings that have never had their own power supply. For each situation, SUN WATT SRL prepares the technical dossier, produces the design where this is required, and carries out the grid connection (racordare) works, coordinating the steps with the distribution operator Retele Electrice Romania S.A. The distance to the existing network and the type of terrain can influence the technical solution, which is why we assess every property in Singureni before deciding on the right type of connection, whether single-phase for an ordinary home or three-phase for higher consumption. We cover the entire commune and its constituent villages, we travel out for measurements and consultancy, and we stay in touch with the customer throughout the whole process, from submitting the application to energisation (punere sub tensiune).
The distribution operator for this part of Giurgiu county is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia, part of the Enel group), through which all connection requests are filed and the ATR is obtained, the technical connection approval required for any new supply. Being a rural commune, the connection is most often made overhead, from the existing low-voltage network on the poles along the village roads, a more economical and faster solution than the underground one, which is used only where the layout makes it necessary. To open the file you generally need the urban planning certificate (certificat de urbanism), the title deed or land registry extract, the site plan, and the completed connection request. From filing the documentation to the actual energisation usually takes between 4 and 12 weeks, the interval varying depending on the operator's workload and the complexity of the work.
Services available in Singureni
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.