Electrical connections · Giurgiu

Electrical Connections in Găiseni

SUN WATT SRL carries out single-phase (230V) and three-phase (400V) electrical connections (bransament) in the commune of Găiseni, Giurgiu County, as a company certified by ANRE for design and execution. The local grid operator is Retele Electrice Romania S.A., and the final connection charge is confirmed through the Technical Connection Approval (ATR). As a rough guide, around 4-12 weeks pass from submitting the dossier to energisation (punere sub tensiune), and we handle the entire documentation, from the application to fitting the meter.

Găiseni is a rural commune in the north of Giurgiu County, located near the A1 Bucharest-Pitesti motorway and on the boundary with Dâmbovița County, with constituent villages (Găiseni, Cărpenișu, Căscioarele, Podișor) and households spread across extensive areas. In communes such as these, the most frequent requests are a connection (bransament) for a house built on a parcel split off from agricultural land, a temporary building-site connection for the duration of construction, and a power upgrade (spor de putere) at a household where a heat pump or a workshop has been added. SUN WATT SRL, a company certified by ANRE for design and execution, serves Găiseni and its constituent villages, travelling on site to measure the distance from the property to the nearest point of the grid and to determine whether the connection should be overhead or underground. We take on all the paperwork: we complete the connection application, follow up on the issuing of the Technical Connection Approval (ATR) from Retele Electrice Romania S.A. (the distribution operator for the Giurgiu area), design and carry out the connection, then compile the Utilisation Installation Dossier (DIU) required for fitting the meter. For an ordinary home we usually choose the single-phase option, while for high consumption we recommend the three-phase option, all clarified after the on-site assessment.

The distribution operator for the area is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia, part of the former Enel group), through which all connection requests are filed and the technical connection approval (ATR) is obtained. In communes of this kind, the connection is usually made overhead, from an existing low-voltage network pole near the property, this being the most common and most economical solution for scattered households; underground work is undertaken only in isolated cases, where a section of the network is already buried. For a new connection, the documents typically required are the urban planning certificate, the title deed or land registry extract, the site plan, and the completed connection application. From the submission of the complete dossier to energisation, the indicative duration is roughly 4-12 weeks, depending on the operator's schedule and the complexity of the work.

Services available in Găiseni

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Electrical connections across Giurgiu

Frequently asked questions — connections in Găiseni

Do you carry out electrical connections in all the villages of Găiseni commune?

Yes. We cover the entire commune of Găiseni, including the constituent villages of Cărpenișu, Căscioarele and Podișor, travelling to the address for an assessment. We check the distance to the Retele Electrice Romania S.A. grid on site and determine whether the connection (bransament) should be overhead or underground, then take care of the dossier, the ATR and the works.

How long does an electrical connection take in Găiseni?

As a rough guide, the issuing of the Technical Connection Approval (ATR) from Retele Electrice Romania S.A. takes a few weeks, and the entire process, from submitting the dossier to energisation (punere sub tensiune), usually falls within roughly 4-12 weeks. For more isolated parcels, where a grid extension may be needed, the timeframe depends on the solution set out in the ATR.

What documents do I need to connect a new house in Găiseni?

For a new build you will usually need the identity document, the proof of ownership (land registry extract), the planning certificate, the site/location plan and the connection application. SUN WATT SRL checks which documents are missing, completes the dossier and submits it to Retele Electrice Romania S.A. on your behalf.

Need an electrical connection in Găiseni?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp