SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Slobozia, Giurgiu County, as an ANRE-certified firm for both design and execution. We work with the distribution grid operator Retele Electrice Romania S.A. and manage the connection dossier from drafting through to energisation (punere sub tensiune).

Slobozia is a commune in the south of Giurgiu County, with a rural village centre and extensive farmland, where requests for electrical connections are increasingly common for new houses, household outbuildings and small business sites built on the edge of the locality. In areas like these, the distance between the new building and the operator's existing grid can vary considerably, and this directly affects the technical connection solution and the documents required. SUN WATT SRL, an ANRE-certified firm for both design and execution, handles the entire course of a connection in Slobozia: assessing the situation on site, preparing the documentation, the technical design and the actual execution of the works, in liaison with the operator Retele Electrice Romania S.A. We act for homes under construction that need an electricity supply, for households moving from a temporary connection to a permanent one, as well as for power-upgrade (spor de putere) situations. We travel to Slobozia and to the surrounding villages in the area, so that owners in the commune do not have to look for a firm all the way in the city. For details and an estimate, you can contact us on 0733 097 440.

The distribution operator for this area is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel), the body through which all connection requests are filed and approved and which issues the technical connection approval (ATR) that underpins any new connection. As a commune with a rural structure, the customary solution remains the overhead connection from the existing low-voltage pole, the most economical and frequently encountered option here, although on the stretches where the network has been buried an underground connection can also be chosen. For a complete file the documents usually required are the urban planning certificate, the title deed or land registry extract, the site plan and the connection request. From the moment the documentation is filed until the actual energisation, the indicative duration of the entire process generally falls between 4 and 12 weeks, depending on the operator's schedule and the complexity of the works.

Services available in Slobozia

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Electrical connections across Giurgiu

Frequently asked questions — connections in Slobozia

Do you carry out electrical connections in the commune of Slobozia in Giurgiu County?

Yes. SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in the commune of Slobozia, Giurgiu County, as well as in the surrounding villages in the area. We are an ANRE-certified firm for design and execution and we work with the operator Retele Electrice Romania S.A.

What do I need to do for a connection at a new house in Slobozia?

For a new house in Slobozia, you contact us, we assess the situation of the plot and the distance to the grid, and then we prepare the documentation and the connection design. We handle the relationship with Retele Electrice Romania S.A. through to energisation (punere sub tensiune). Call 0733 097 440 for an initial discussion.

Do you travel to the villages around the commune of Slobozia?

Yes, we travel to Slobozia and to the neighbouring rural localities in the south of Giurgiu County. We determine the distance to the existing grid during the on-site assessment, as this affects the technical connection solution.

Need an electrical connection in Slobozia?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp