Electrical connections · Giurgiu

Electrical connections in Florești-Stoenești

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in the commune of Florești-Stoenești, Giurgiu County, as a firm certified by ANRE for design and execution, working with the distribution operator Retele Electrice Romania S.A. We handle single-phase connections (230V) for ordinary homes and three-phase connections (400V) for high consumption, taking care of every stage, from the grid connection request and ATR (Technical Connection Approval) through to fitting the meter. As a rough guide, around 4-12 weeks pass from the dossier to energisation (punere sub tensiune), and the final tariff is confirmed through the Technical Connection Approval (aviz tehnic de racordare).

Florești-Stoenești lies in the north of Giurgiu County, in the Argeș floodplain, on the road corridor between Bucharest and Giurgiu, and is made up of several villages (Florești, Stoenești, Palanca and the neighbouring villages). Its proximity to the capital and to the motorway has turned the area into an attractive one for building family homes, but also holiday homes and plots bought for the future, which means that many properties need their first power supply. SUN WATT, a firm certified by ANRE for design and execution, steps in precisely in these situations: a permanent connection for a finished home, a temporary connection during the construction works, a power upgrade (spor de putere) or a switch from single-phase (230V) to three-phase (400V) where a heat pump, a workshop or an EV charging station is being installed. Because on new plots, especially in the floodplain areas and on the edge of the villages, the grid does not always reach the property boundary, assessing the distance to the nearest connection point is an important step that we carry out on site. We work with the distribution operator Retele Electrice Romania S.A. (formerly E-Distributie Muntenia / Enel) and take on the entire procedure: the grid connection request, obtaining the Technical Connection Approval (aviz tehnic de racordare), designing and building the connection (bransament), the Utilisation Installation Dossier (DIU) and preparation for fitting the meter. You keep your own paperwork; we make the rest of the trips.

The distribution operator for this part of Giurgiu county is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel); all connection requests are filed with this operator and the ATR (technical connection approval) is issued through it as well. Because the villages of the commune largely retain a rural layout, with the low-voltage network mounted on poles, the usual and more economical solution remains the overhead connection run from the existing pole near the property, although on the more developed sections, where the network is buried, the underground option can also be carried out. For a new connection one typically prepares the urban planning certificate, the title deed or land registry extract, the site plan and the connection request. As a guideline, from the filing of the complete dossier to energisation an interval of roughly 4-12 weeks elapses, depending on the operator and the complexity of the works.

Services available in Florești-Stoenești

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Electrical connections across Giurgiu

Frequently asked questions — connections in Florești-Stoenești

Why does the distance to the grid matter for a connection in Florești-Stoenești?

On many plots in the commune, especially in the floodplain areas and on new parcels at the edge of the villages, the Retele Electrice Romania S.A. grid does not reach directly to the property boundary. In that case, a grid extension or an additional pole may be needed, which influences both the technical solution (overhead or underground connection) and the tariff. That is why we assess the distance on site before submitting the dossier, and the exact conditions are confirmed through the Technical Connection Approval (aviz tehnic de racordare).

Can I have a connection installed for a holiday home in Florești-Stoenești?

Yes. For a holiday home or a property used seasonally, a single-phase connection (230V) is usually enough for ordinary consumption. We take care of the grid connection request, the Technical Connection Approval (aviz tehnic de racordare) and the execution of the connection, just as for a permanent home. If high-consumption equipment is added in the future, a switch to three-phase (400V) can be requested later.

How long does it take to be connected to electricity in the commune of Florești-Stoenești?

As a rough guide, the entire process takes around 4-12 weeks, of which the issuing of the Technical Connection Approval (ATR) by Retele Electrice Romania S.A. usually takes a few weeks. On plots that require a grid extension, the timeframe may increase. SUN WATT submits and follows up the dossier step by step, so that you progress towards energisation (punere sub tensiune) as quickly as possible.

Need an electrical connection in Florești-Stoenești?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp