Ogrezeni is a commune in the north of Giurgiu County, located near the Arges river and the localities in the Bolintin area, where the development of individual homes and the extension of existing households constantly creates the need for new electrical connections. SUN WATT SRL covers this area and travels to the villages that make up the commune to assess on site the condition of the land and the distance to the distribution network. We frequently work for owners of new houses who need a first connection, for those who are building and require a construction-site connection, as well as for households switching from a single-phase to a three-phase supply following the installation of larger appliances. As an ANRE-certified company for both design and execution, we prepare the technical documentation and the connection dossier (dosar de racordare) and carry out the work itself, staying in contact with the grid operator Retele Electrice Romania S.A. throughout the entire process. For details and to discuss your situation in Ogrezeni, you can call us on 0733 097 440.
All connection requests and the issuing of the technical connection approval (ATR) for Ogrezeni are handled through the distribution operator Rețele Electrice România S.A., formerly E-Distribuție Muntenia (Enel), which owns and manages the network in this part of Giurgiu county. As a predominantly rural commune, the usual and more economical solution is the overhead connection made from the existing low-voltage pole near the property, with the underground connection being used only where the local layout or distance requires it. For a new connection, the certificate of urbanism, the property deed or the land registry extract, the site plan and the connection application are typically required, documents that we prepare together with the beneficiary to avoid delays at filing. The indicative duration from submitting the complete dossier to actual energisation is roughly 4-12 weeks, depending on the operator's pace and the complexity of the works.
Services available in Ogrezeni
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.