Electrical connections in Ogrezeni

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Ogrezeni, Giurgiu County, as an ANRE-certified company for design and execution. We coordinate the entire documentation with the grid operator Retele Electrice Romania S.A. and provide single-phase or three-phase connections for homes and new builds in the commune.

Ogrezeni is a commune in the north of Giurgiu County, located near the Arges river and the localities in the Bolintin area, where the development of individual homes and the extension of existing households constantly creates the need for new electrical connections. SUN WATT SRL covers this area and travels to the villages that make up the commune to assess on site the condition of the land and the distance to the distribution network. We frequently work for owners of new houses who need a first connection, for those who are building and require a construction-site connection, as well as for households switching from a single-phase to a three-phase supply following the installation of larger appliances. As an ANRE-certified company for both design and execution, we prepare the technical documentation and the connection dossier (dosar de racordare) and carry out the work itself, staying in contact with the grid operator Retele Electrice Romania S.A. throughout the entire process. For details and to discuss your situation in Ogrezeni, you can call us on 0733 097 440.

All connection requests and the issuing of the technical connection approval (ATR) for Ogrezeni are handled through the distribution operator Rețele Electrice România S.A., formerly E-Distribuție Muntenia (Enel), which owns and manages the network in this part of Giurgiu county. As a predominantly rural commune, the usual and more economical solution is the overhead connection made from the existing low-voltage pole near the property, with the underground connection being used only where the local layout or distance requires it. For a new connection, the certificate of urbanism, the property deed or the land registry extract, the site plan and the connection application are typically required, documents that we prepare together with the beneficiary to avoid delays at filing. The indicative duration from submitting the complete dossier to actual energisation is roughly 4-12 weeks, depending on the operator's pace and the complexity of the works.

Services available in Ogrezeni

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Electrical connections across Giurgiu

Frequently asked questions — connections in Ogrezeni

Do you carry out electrical connections for new houses in Ogrezeni?

Yes. In Ogrezeni we provide the first connection (bransament) for newly built homes, both single-phase and three-phase, depending on the appliances you will install. As an ANRE-certified company, we prepare the design, submit the connection dossier (dosar de racordare) to Retele Electrice Romania S.A. and carry out the work through to energisation (punere sub tensiune).

Can I obtain a construction-site connection for a build in the Ogrezeni commune?

Yes, a construction-site connection (temporary) is a common solution for households under construction in Ogrezeni, so they have power during the works. The permanent connection can be arranged later on. We can advise you which option suits your project on 0733 097 440.

How much does an electrical connection in Ogrezeni cost?

The cost depends on the type of connection (single-phase or three-phase), the distance to the existing network and the specifics of the land in that part of the Ogrezeni commune. After an on-site assessment we can give you a clear estimate. Call 0733 097 440 for a concrete discussion.

Need an electrical connection in Ogrezeni?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp