Gogoșari is a commune in the south of Giurgiu County, close to the border with Bulgaria, with a predominantly rural character and households spread across the village centre and the surrounding agricultural plots. For local property owners, a new electrical connection (bransament) most often becomes necessary when a house is built on a vacant plot, when a household outbuilding is extended, or when an older building needs to be reconnected after a period of disuse. SUN WATT SRL, a firm certified by ANRE for design and execution, supports you throughout the entire process: from determining the required power and preparing the connection file (dosar de racordare), to the actual execution of the single-phase or three-phase connection and getting the installation ready for energisation (punere sub tensiune). The distribution operator for Gogoșari is Retele Electrice Romania S.A., and we align every stage with its requirements, so that the approvals and the acceptance inspection proceed without delays. We cover the entire commune and its belonging villages, we travel on site for assessment, and we provide clear advice, with no unrealistic promises, tailored to the distances and the specifics of the grid in this part of Giurgiu County.
The distribution operator that manages the network in this part of Giurgiu county is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia, part of the former Enel group), and it is through this operator that all connection requests are filed and the ATR (technical connection approval) is obtained. As a locality of rural character, the most frequently applied solution is the overhead connection, made from the existing pole on the lane, a more economical option well suited to households situated away from the main road, although in areas where the network is buried an underground connection can also be carried out. For a complete dossier the documents usually required are the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the connection request, in the preparation of which we can guide you step by step. The total duration, from filing the dossier to the actual energisation, falls indicatively between 4 and 12 weeks, depending on the operator's processing times and the complexity of the work.
Services available in Gogoșari
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. Labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.