Electrical connections · Giurgiu

Electrical Connections in Valea Dragului

SUN WATT SRL carries out single-phase (230V) and three-phase (400V) electrical connections in Valea Dragului, Giurgiu County, as a company certified by ANRE for design and execution. In this commune on the left bank of the Arges, the distribution operator is Retele Electrice Romania S.A., and the final connection fee is confirmed through the Technical Connection Approval (ATR). As a rough guide, around 4-12 weeks pass from submitting the dossier to energisation (punere sub tensiune).

Valea Dragului is a small commune on the eastern edge of Giurgiu County, made up of a single village of the same name, set on the left bank of the Arges right at the boundary with Calarasi County and crossed by the county road DJ401. As a predominantly rural settlement stretched out along the main road, the situations for which locals need an electrical connection (bransament) are typical of this plain area in the Arges floodplain: a house built on a plot at the edge of the village, a farm outbuilding or stable that needs to be supplied separately, a water pumping or irrigation system on land near the river, as well as the replacement of an old connection that can no longer cope with today's consumption. SUN WATT SRL, a company certified by ANRE for design and execution, travels to Valea Dragului to assess the site and the distance to the nearest point of the network, then takes over the entire procedure: the grid connection (racordare) application and the documents, following up the Technical Connection Approval (ATR) with the operator Retele Electrice Romania S.A. (formerly E-Distributie Muntenia), the design and the actual installation of the connection, as well as the Utilisation Installation Dossier (DIU) required for the meter. For an ordinary household we usually choose the single-phase option (230V), and for higher consumption, pumps or machinery, the three-phase option (400V). We work on a turnkey basis, from dossier to pole, so the owner does not have to make trips to the operator on their own.

All connection requests for Valea Dragului are filed with the distribution operator Rețele Electrice România S.A. (formerly E-Distribuție Muntenia / Enel), the entity that also issues the technical connection approval (ATR) required for any new consumption point. Given the rural character of the village, stretched along the main road, the usual solution remains the overhead connection, run from the existing low-voltage network pole nearby, the most economical option for the households and outbuildings in the area. To compile the dossier you typically need the urban planning certificate, the proof of ownership or the land registry extract, the site plan and the completed connection application. From the moment the documentation is submitted until the actual energisation, the process takes an indicative 4 to 12 weeks, the interval varying with the operator's schedule and the complexity of the work.

Services available in Valea Dragului

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Electrical connections across Giurgiu

Frequently asked questions — connections in Valea Dragului

Do you carry out electrical connections in Valea Dragului, even though it is one of the smaller communes in Giurgiu?

Yes. We travel to Valea Dragului and the neighbouring area in the east of Giurgiu County, along the DJ401 route, whether it concerns a new house, a farm outbuilding or a pumping or irrigation system on land beside the Arges. We carry out single-phase and three-phase connections, working with the operator Retele Electrice Romania S.A. Call 0733 097 440 for a chat about your situation.

What affects the cost of the connection if the land is far from the network in Valea Dragului?

On plots located at the edge of the village or in the Arges floodplain, the distance to the nearest pole and any network extension can increase the cost and the duration. The technical solution (an overhead connection from the nearby pole, or an underground one with excavation and a protective duct) and the exact fee are set by the operator Retele Electrice Romania S.A. through the Technical Connection Approval (ATR), after the on-site assessment. We provide the initial estimate free of charge.

What documents do I need to connect a new house in Valea Dragului?

As a rule, you need an identity document, the proof of ownership (land registry extract), the urban planning certificate for construction, the site/location plan and the grid connection application. SUN WATT SRL checks which documents are missing, prepares the complete dossier and submits it to Retele Electrice Romania S.A. on your behalf, handling all the paperwork right up to the installation of the meter.

Need an electrical connection in Valea Dragului?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp