Răsuceni is a rural commune in the south of Giurgiu County, in the Burnaz plain, made up of several villages with households spread across large areas. Here, requests for an electrical connection (bransament) come largely from people building a house on a plot they have inherited or bought on the edge of the village, from those modernising an old household without a proper connection, or from those who need power for a farm outbuilding, a stable, a water borehole or a small workshop. Because dwellings are often located some distance from the existing grid, one of the first stages is checking the distance to the nearest pole and the connection solution, overhead or underground. SUN WATT, a company certified by ANRE for design and execution, travels to Răsuceni and its constituent villages to assess the site and take over the entire procedure: we prepare the grid connection (racordare) application with the required documents, follow up the issuing of the Technical Connection Approval (ATR) from Retele Electrice Romania (the distribution operator for the Muntenia area, formerly E-Distributie Muntenia), design and build the connection, then prepare the Utilisation Installation Dossier (DIU) up to the fitting of the meter. We recommend a single-phase connection (230V) for ordinary domestic consumption and a three-phase one (400V) where high power is needed for machinery or pumps. We spare you the long trips into town and the dealings with the operator, providing a turnkey solution, from dossier to pole.
The distribution operator managing the network in this part of Giurgiu county is Rețele Electrice România S.A. (formerly E-Distribuție Muntenia, part of the Enel group), and it is through this operator that all connection requests are filed and the ATR, the technical connection approval without which the work cannot begin, is obtained. Being a predominantly rural area, the common and more economical solution is the overhead connection, run from an existing low-voltage pole near the property, with the underground option reserved for the specific cases where the local network is already buried. For a new connection, the dossier usually includes the urban planning certificate, the title deed or land registry extract, the site plan of the land, and the connection request itself. From the full filing of the documentation to actual energisation, the indicative duration is roughly 4-12 weeks, depending on the operator's pace and the complexity of the work.
Services available in Răsuceni
Single-phase connection
A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).
Three-phase connection
A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.
Temporary site connection
A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.
Grid connection
Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.
Power increase
A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.
Prosumer / solar connection
Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.