Electrical connections · Giurgiu

Electrical connections in Giurgiu

SUN WATT SRL carries out electrical connections (bransament) and grid connections (racordare) in Giurgiu, being an ANRE-certified company for design and execution. We handle the entire process, from the connection dossier submitted to the grid operator Retele Electrice Romania S.A. through to the energisation (punere sub tensiune) of the home or consumption point in Giurgiu.

Giurgiu, the county-seat municipality located on the banks of the Danube, has a mixed structure, with residential neighbourhoods, the port area and platforms with economic activity, as well as nearby localities and villages as the town spreads out. This diversity means that requests for an electrical connection (bransament) are varied: new houses built on the outskirts of the municipality, older homes that need a power upgrade (spor de putere) for electric boilers or modern appliances, plots without utilities where building starts from scratch, as well as commercial premises or workshops that require a three-phase connection. For every situation in Giurgiu, SUN WATT prepares and submits the connection dossier to the grid operator Retele Electrice Romania S.A., follows up on obtaining the technical connection approval (aviz tehnic de racordare) and carries out the actual works using compliant materials. As a company certified by ANRE for both design and execution, we cover the entire chain of an electrical connection, without you needing to coordinate several suppliers. We travel to Giurgiu and the nearby areas of the county, offering advice from the very first discussion, so that you know from the outset which documents are required and what the stages are up to energisation (punere sub tensiune).

The distribution operator managing the network in this area is Retele Electrice Romania S.A. (formerly E-Distributie Muntenia, part of the Enel group), the body through which all connection requests are filed and which issues the technical connection approval (ATR). Technically, owing to the municipality's mixed layout, the solution varies from case to case: in the dense urban sectors, where the local network is buried, the connection is frequently carried out underground, whereas in the communes and villages on the city's outskirts the overhead connection, run from the existing pole, remains the customary and more economical option. To open the file, the documents usually required are the urban planning certificate, the title deed or land registry extract, the site plan and the completed connection request. As a guide, the total duration from filing the dossier to energisation falls between 4 and 12 weeks, depending on the operator and the complexity of the work.

Services available in Giurgiu

Single-phase connection

A single-phase electrical connection (230V) is the standard supply for homes with typical consumption, usually approved up to around 11 kW. SUN WATT, an ANRE-certified company, handles the entire process from start to finish, with 2026 prices starting from 1,800 lei. The timeline from file submission to energisation is typically 4-12 weeks, with the final cost confirmed through the ATR (Technical Connection Approval).

from 1.800 lei Details →

Three-phase connection

A three-phase electrical connection (400V) is needed for high consumption or powerful equipment such as heat pumps, workshops, machine tools or EV charging stations. SUN WATT, an ANRE-attested firm, handles the entire process — from the paperwork and the Technical Connection Approval (ATR) through to energisation — typically within 4 to 12 weeks. Prices start from 2,900 lei.

from 2.900 lei Details →

Temporary site connection

A temporary site connection supplies your construction site with power throughout the building works, before the permanent connection is installed. It is obtained through a connection application and a Technical Connection Approval (ATR) from Retele Electrice Romania, and is carried out by an ANRE-certified company. Prices start from 2,200 lei (labour plus materials, excluding the operator's fees), with the whole process usually taking around 4-12 weeks.

from 2.200 lei Details →

Grid connection

Electricity grid connection is the process of linking a plot, house or new premises to the electricity distribution network so you can have your own meter and power at the socket. The process involves six stages: the connection request, the Technical Connection Approval (ATR), the connection contract, the ANRE-certified service line works, the Utilization Installation Dossier (DIU) and meter installation. In Bucharest, Ilfov and Giurgiu the network operator is Retele Electrice Romania S.A. (Distributie Energie Electrica Romania). The service starts from 900 lei (labour, excluding operator fees) and typically takes 4 to 12 weeks.

from 900 lei Details →

Power increase

A power increase means raising the approved electrical power at your existing connection when your current installation can no longer cope with your consumption. It is carried out through an application to the operator Retele Electrice Romania (Distributie Energie Electrica Romania), followed by a new ATR (Technical Connection Approval), a contract and any required connection changes. In 2026, labour starts from 350 lei (excluding operator fees), with an indicative duration of 4 to 12 weeks.

from 350 lei Details →

Prosumer / solar connection

Connecting a photovoltaic system to the grid as a prosumer means submitting a connection application to Retele Electrice Romania (Distributie Energie Electrica Romania). SUN WATT, an ANRE-certified company, prepares the full dossier, obtains the ATR (Technical Connection Approval), and coordinates the installation of a bidirectional meter so you can feed your surplus energy back into the grid. The price is set through a personalised quote. Call 0733 097 440.

quote Details →

Electrical connections across Giurgiu

Frequently asked questions — connections in Giurgiu

How long does an electrical connection take in Giurgiu?

The duration depends on the type of connection (single-phase or three-phase) and on the approval times of the grid operator Retele Electrice Romania S.A. After the connection dossier is submitted and the technical connection approval (aviz tehnic de racordare) is obtained, the actual works in Giurgiu are carried out quickly by the SUN WATT team. We will give you an estimated timeframe once we have assessed the specific situation.

What documents do I need for the grid connection in Giurgiu?

As a rule, you will need the title deed to the land or home, the identity document of the holder, the urban planning certificate (where applicable) and details of the requested power. SUN WATT helps you prepare and submit the complete dossier to Retele Electrice Romania S.A. for the consumption point in Giurgiu.

Do you also carry out electrical connections in the localities surrounding the municipality of Giurgiu?

Yes. In addition to the municipality of Giurgiu, we travel to the nearby localities in the county, as well as to the Ilfov and Bucuresti areas. Call 0733 097 440 to check the exact coverage for your address.

Need an electrical connection in Giurgiu?

Get a free quote. We handle everything — from paperwork to the pole.

  • ✓ Free assessment & quote
  • ✓ Reply within 24h
  • ✓ ANRE-certified — execution + design
  • ✓ We handle all the paperwork
Call now WhatsApp
Message us on WhatsApp